EPC Contractor Contact Directory India: Decision-Maker Leads

Projects India tracks 75,549 upcoming projects across all sectors, giving EPC contractors, equipment suppliers and B2B sales teams verified decision-maker contacts that generic directories cannot provide.

NS
Nitisha ShindeResearch Desk, Projects India

9 min read · 1,629 words
EPC Contractor Contact Directory India: Decision-Maker Leads

Projects India tracks 75,549 upcoming projects across all sectors and states, with a combined recorded cost of roughly Rs 391.7 lakh crore. Behind these projects are government departments, public-sector undertakings, private developers and industrial conglomerates — each of them a potential client for EPC contractors, equipment suppliers and specialist consultants. Finding the right EPC contractor details and contact is the first step; knowing which projects are live and at what stage is what turns that contact into a conversation.

Most Active Promoters: Who Is Commissioning EPC Work

The table below lists the promoters with the highest number of projects in our database. These are the organisations that repeatedly issue EPC contracts, making them the most valuable targets for contractors and suppliers building a pipeline. As the chart below shows, the spread of active promoters is wide — spanning state public works departments, national utilities and private corporations.

Promoter Projects Tracked Recorded Cost
Public Works Department, Maharashtra 862 Rs 33,483 crore
Uttar Pradesh Jal Nigam 853 Rs 14,343 crore
National Highways Authority of India 799 Rs 6.64 lakh crore
Public Works Department, Odisha 728 Rs 14,259 crore
Public Works Department, Madhya Pradesh 520 Rs 15,277 crore
Karnataka Power Transmission Corporation Limited 409 Rs 2,871 crore
Drinking Water and Sanitation Department, Jharkhand 374 Rs 7,996 crore
Public Works Department, West Bengal 349 Rs 7,950 crore
Public Works Department, Tamil Nadu 340 Rs 8,770 crore
Public Health Engineering Department, Bihar 334 Rs 3,368 crore
Roads and Buildings Department, Gujarat 323 Rs 6,822 crore
Indian Oil Corporation Limited 306 Rs 2.39 lakh crore
Most active promoters — All sectors in India (projects)
Most active promoters — All sectors in India (projects) — Public Works Department, Maharashtra: 862; Uttar Pradesh Jal Nigam: 853; National Highways Authority of India: 799; Public Works Department, Odisha: 728; Public Works Department, Madhya Pradesh: 520; Karnataka Power Transmission Corporation Limited: 409; Drinking Water and Sanitation Department, Jharkhan: 374; Public Works Department, West Bengal: 349; Public Works Department, Tamil Nadu: 340; Public Health Engineering Department, Bihar: 334Public Works Department, Maharash…862Uttar Pradesh Jal Nigam853National Highways Authority of In…799Public Works Department, Odisha728Public Works Department, Madhya P…520Karnataka Power Transmission Corp…409Drinking Water and Sanitation Dep…374Public Works Department, West Ben…349Public Works Department, Tamil Na…340Public Health Engineering Departm…334
Source: Projects India database, November 2026

What this list makes clear is that state public works departments collectively represent hundreds of active projects. For an EPC contractor focused on civil infrastructure, roads or water supply, these departments are repeat clients — which means identifying and maintaining relationships with their project directors and chief engineers is more productive than chasing individual tenders in isolation. Indian Oil Corporation Limited, with 306 projects and a recorded cost of Rs 2.39 lakh crore, represents a different kind of opportunity: a single vertically integrated corporation that sub-contracts EPC work across refinery, pipeline and storage segments. Our VendorConnect contractor and supplier directory maps these organisations to named decision-makers, procurement teams and project-level contacts — a level of specificity that a generic company listing cannot provide.

Largest Individual Projects and Their Promoters

For EPC contractors and major equipment suppliers, mega-projects represent the highest-value opportunities, often running over multiple years with multiple sub-contract packages. The following are among the largest upcoming projects in our database, each at a stage where contractor and supplier engagement is either already under way or imminent.

Project Promoter Location Recorded Cost Stage
Optical Fibre Cables Network Reliance Jio Infocomm Limited Maharashtra (multi-state) Rs 1,71,000 crore Construction Started
Cement Grinding Plant, Kendrapara ArcelorMittal Nippon Steel India Limited Kendrapara, Odisha Rs 1,34,004 crore Under Approvals
Refinery & Petrochemical Complex, Vadinar Nayara Energy Limited Devbhumi Dwarka, Gujarat Rs 1,30,000 crore Under Approvals
Aluminium Smelter Plant, Dhenkanal Vedanta Limited Dhenkanal, Odisha Rs 1,28,000 crore Under Approvals
Chemical & Petrochemical Unit, Srikakulam Haldia Petrochemicals Limited Srikakulam, Andhra Pradesh Rs 1,20,000 crore Planning
Steel Plant, Angul Jindal Steel & Power Limited Angul, Odisha Rs 1,19,952 crore Construction Started (Dec 2027)
Mumbai-Ahmedabad High Speed Rail National High Speed Rail Corporation Limited Mumbai, Maharashtra Rs 1,08,000 crore Construction Started
Data Centre Park, Odisha Adani Group Odisha Rs 1,04,000 crore Approvals Received
Refinery, Nellore Bharat Petroleum Corporation Limited Nellore, Andhra Pradesh Rs 1,03,408 crore Under Approvals
Integrated Steel Plant, Kendrapara ArcelorMittal Nippon Steel India Limited Kendrapara, Odisha Rs 1,02,275 crore Under Approvals

Projects at the Construction Started stage — such as the Reliance Jio fibre network and the Jindal Steel Plant in Angul — are already procuring sub-contractors and specialist suppliers. Projects marked Under Approvals, such as the Nayara Energy refinery and the ArcelorMittal Nippon Steel plant, are preparing EPC bid documents and preliminary vendor lists. For more context on major industrial activity in Odisha, see our upcoming industrial projects in Odisha overview, and for Andhra Pradesh, the Andhra Pradesh industrial projects guide covers the petrochemical and refinery pipeline in detail.

Where Demand Is Concentrated: States and Project Stages

Maharashtra leads all states in project count, with 12,964 projects tracked in our database, followed by Gujarat at 7,111 and Karnataka at 6,641. Uttar Pradesh records 5,031 projects and Andhra Pradesh 3,996. For an EPC contractor or equipment supplier deciding where to place business-development resources, this geography tells a clear story: the western corridor from Gujarat through Maharashtra and the southern states from Andhra Pradesh through Karnataka and Tamil Nadu carry the heaviest pipeline. As the chart below shows, the top five states account for a substantial share of all tracked projects nationally.

Upcoming projects by state — All sectors in India
Upcoming projects by state — All sectors in India — Maharashtra: 12,964; Gujarat: 7,111; Karnataka: 6,641; Uttar Pradesh: 5,031; Andhra Pradesh: 3,996; Madhya Pradesh: 3,926; Odisha: 3,647; Tamil Nadu: 3,421; Telangana: 3,127; West Bengal: 3,021Maharashtra12,964Gujarat7,111Karnataka6,641Uttar Pradesh5,031Andhra Pradesh3,996Madhya Pradesh3,926Odisha3,647Tamil Nadu3,421Telangana3,127West Bengal3,021
Source: Projects India database, November 2026

By sub-sector, Real Estate leads with 10,907 projects, followed by Other Construction Projects at 10,217 and Water & Sewerage Pipeline & Distribution at 7,511. Power Distribution (4,701 projects) and Roadways/Highways (4,636 projects) round out a top five that covers the core EPC segments. For anyone selling pipes, pumps, transformers, cables, structural steel or civil construction services, these figures point to where tender volume is highest. Our upcoming projects database lets users filter by sub-sector, state and project stage simultaneously, so a sales team can generate a targeted list in minutes rather than manually sifting directories.

On project stage, our records show 35,919 projects currently Under Approvals — the largest single cohort — followed by 17,705 at Construction Started and 12,064 at Planning. A further 2,075 have received approvals and are preparing to move to procurement. Projects in the Construction Started and Approvals Received stages are where near-term EPC contract awards are most likely; those under approvals represent the medium-term pipeline where relationship-building now translates into shortlisting later. As the chart below illustrates, the pipeline weighted by stage is heavily skewed toward pre-construction, meaning the addressable market for contractors is substantially larger than the currently active work alone.

Projects by stage — All sectors in India
Projects by stage — All sectors in India — Under Approvals: 35,919; Construction Started: 17,705; Planning: 12,064; Completed: 8,597; Early / Announced: 4,488; Hold: 2,088; Approvals Received: 2,075; Nearly Completion: 1,210; Cancelled: 1,010Under Approvals35,919Construction Started17,705Planning12,064Completed8,597Early / Announced4,488Hold2,088Approvals Received2,075Nearly Completion1,210Cancelled1,010
Source: Projects India database, November 2026

How to Approach These Companies

Timing an approach to a project promoter or the EPC contractor they have engaged depends almost entirely on stage. At the Planning and Early/Announced stages, the project team is typically small — often a project director and a technical adviser. Contact at this stage is about establishing awareness, sharing capability credentials and understanding the scope direction before bid documents are drafted. This is also when preferred vendor lists begin to form informally.

Once a project moves to Under Approvals or Approvals Received, the procurement function becomes more active. Engineering consultants are often engaged first, followed by pre-qualification exercises for EPC bidders and sub-contractors. Equipment specifications are drafted and long-lead items — such as boilers, turbines, switchgear and specialised piping — begin to be discussed. Suppliers of such items should aim to have their products specified at this stage, not after the EPC contractor has been appointed.

At the Construction Started stage, the EPC main contractor is in place and sub-contract packages are being floated. Approaches at this stage are directed at the EPC contractor's procurement or project manager rather than the promoter. For a material supplier, this is the time to respond to requests for quotation and ensure approved-vendor status is established with the main contractor.

Across all stages, the most productive contacts within a project organisation are typically the project director or general manager (for strategic vendor decisions), the head of procurement or contracts (for bid qualification), and the project manager or site engineer (for execution-phase purchases). Our VendorConnect directory maps these roles to named individuals at both promoter organisations and major EPC firms, with designations and direct contact details that generic industry directories do not carry.

What This Means for Suppliers and EPC Contractors

For an EPC contractor looking for sub-contract work, the actionable insight from our database is straightforward: 964 projects were added in the most recent 90-day period, up from 711 in the period before that. That acceleration means the pipeline is growing faster than it was. Of all upcoming projects, 19,030 are marked verified — meaning our research team has cross-checked project details against official sources. These verified records are the ones most worth prioritising in outreach, because the project details, promoter contacts and stage information are confirmed rather than indicative.

For a material or equipment supplier, the sub-sector data points to where volume is concentrated. Water and sewerage pipeline and distribution alone accounts for 7,511 projects, driven in large part by promoters such as Uttar Pradesh Jal Nigam (853 projects) and the Drinking Water and Sanitation Department, Jharkhan (374 projects). A pipe manufacturer or pump supplier that maps its sales effort to these promoters — and to the EPC contractors they award work to — will find a more efficient use of its business-development budget than broad-based marketing.

For B2B sales teams, the recently added projects signal where new conversations are possible before competitors have identified the opportunity. The Bio-CNG Plant in Salem by Refex Group, the Oil India offshore exploration expansion off Maharashtra at Rs 15,000 crore, and the Captive Power Project in Odisha by Adani Group are all at the Early/Announced stage — the point at which a first contact with the project team carries the most value. Our projects intelligence platform delivers these leads as soon as they are added, with promoter contact details, project scope and stage information in a single record.

Contractors and suppliers who want to understand the data-centre opportunity specifically — a segment where Adani Group alone has a Rs 1,04,000 crore project in Odisha at the Approvals Received stage — can read our data centre tenders guide for a detailed breakdown of EPC and supply chain requirements in that sub-sector. For a free sample project report showing the depth of contact and project data available, the free sample report gives a representative record from across our database.

Frequently asked questions

How many upcoming EPC projects does Projects India track?

As of November 2026, Projects India tracks 75,549 upcoming projects across all sectors and states, with a combined recorded cost of roughly Rs 391.7 lakh crore. Of these, 19,030 are marked verified by our research team, meaning the project details and promoter contacts have been cross-checked against official sources.

Which states have the most EPC project opportunities in India?

Maharashtra leads with 12,964 projects tracked, followed by Gujarat at 7,111, Karnataka at 6,641, Uttar Pradesh at 5,031 and Andhra Pradesh at 3,996. These five states collectively account for the largest share of upcoming project volume and are where EPC contract opportunities are most concentrated.

Which promoters issue the most EPC contracts in India?

Among the most active promoters in our database are Public Works Department Maharashtra with 862 projects, Uttar Pradesh Jal Nigam with 853, National Highways Authority of India with 799, and Indian Oil Corporation Limited with 306 projects at a recorded cost of Rs 2.39 lakh crore. These organisations are repeat issuers of EPC contracts across infrastructure and industrial sectors.

What is the best stage to contact an EPC promoter or contractor?

Contact at the Planning or Early/Announced stage is most effective for establishing vendor awareness before bid documents are drafted. The Under Approvals and Approvals Received stages are when procurement becomes active and preferred vendor lists form. At Construction Started, approaches are best directed at the appointed EPC contractor's procurement team rather than the project promoter.

How often are new projects added to the Projects India database?

Projects India added 964 new projects in the most recent 90-day period, up from 711 in the previous 90 days. This acceleration means the pipeline is expanding at a faster rate, giving subscribers a growing stream of early-stage leads for EPC and supply chain outreach.

Which sub-sectors have the highest number of upcoming projects for EPC contractors?

Real Estate leads with 10,907 projects, followed by Other Construction Projects at 10,217 and Water and Sewerage Pipeline and Distribution at 7,511. Power Distribution accounts for 4,701 projects and Roadways/Highways for 4,636 — together forming the core sub-sectors where EPC tender volume is highest across India.

Get the project list for your sector

  • Project name, promoter, cost, stage and location
  • Verified decision-maker contacts
  • Updated daily — plus live tenders
Or ask on WhatsApp
NS
About the authorNitisha Shinde · Research Desk, Projects India

Nitisha Shinde leads the research desk at Projects India, which tracks upcoming private and government projects, tenders and awarded contracts across 51 sectors in India.

This article was drafted with AI assistance from Projects India's own project and tender records, and checked against those records before publication.

More from Insights

Manufacturing Companies in India: B2B Directory Guide
Manufacturing Companies in India: B2B Directory Guide
List of Data Centres and Companies in India 2026
List of Data Centres and Companies in India 2026
EPC Companies and Contractors in India: Directory 2026
EPC Companies and Contractors in India: Directory 2026