Data Centre Tenders in India: EPC & Supplier Guide
Projects India tracks 75,121 upcoming projects across all sectors in India, including active data centre construction and fit-out tenders. The combined recorded project cost stands at Rs 377.92 lakh crore.
9 min read · 1,672 words
Projects India tracks 75,121 upcoming projects across all sectors nationwide, of which 18,889 are verified, with a combined recorded cost of approximately Rs 377.92 lakh crore as of 30 October 2026. Within this pipeline, data centre construction, fit-out and infrastructure tenders are active across multiple states, sitting alongside a broad cross-section of commercial, industrial and government-driven projects that EPC contractors and equipment suppliers can monitor in real time.
India's project pipeline at a glance
| Metric | Figure |
|---|---|
| Total upcoming projects tracked | 75,121 |
| Verified projects | 18,889 |
| Added in last 90 days | 633 |
| Added in prior 90-day period | 704 |
| Combined recorded project cost | Rs 377.92 lakh crore |
| Total projects tracked nationally | 84,726 |
| Projects under construction | 17,589 |
| Projects under approvals | 35,864 |
Largest upcoming projects: data centre context within the broader pipeline
Data centre tenders in India sit within a national project pipeline dominated by large-scale infrastructure, industrial and commercial investment. The table below lists the largest upcoming projects currently in our database — understanding this broader investment landscape matters to data centre contractors and suppliers because the same EPC firms, civil contractors and electrical equipment vendors compete across several of these categories simultaneously.
| Project | Promoter | Location | Cost | Stage |
|---|---|---|---|---|
| Optical Fibre Cables Network Project (Multi States) | Reliance Jio Infocomm Limited | Maharashtra | Rs 1,71,000 crore | Construction Started |
| Cement Grinding Plant Project, Mahakalpara | ArcelorMittal Nippon Steel India Limited | Kendrapara, Odisha | Rs 1,34,004 crore | Under Approvals |
| Refinery & Petrochemical Complex, Vadinar — Expansion | Nayara Energy Limited | Devbhumi Dwarka, Gujarat | Rs 1,30,000 crore | Under Approvals |
| Captive Power Plant Project, Kamakhyanagar | Vedanta Limited | Dhenkanal, Odisha | Rs 1,28,000 crore | Under Approvals |
| Chemical & Petrochemical Mfg Unit, Santabommali | Haldia Petrochemicals Limited | Srikakulam, Andhra Pradesh | Rs 1,20,000 crore | Planning |
| Steel Plant Project, Kerjang | Jindal Steel & Power Limited | Angul, Odisha | Rs 1,19,952 crore | Construction Started |
| High Speed Rail Corridor (Bullet Train), Mumbai–Ahmedabad | National High Speed Rail Corporation Limited | Mumbai, Maharashtra | Rs 1,08,000 crore | Construction Started |
| Railways Project, Sabarmati–Bandra Kurla Complex (Ahmedabad–Mumbai) | National High Speed Rail Corporation Limited | Ahmedabad, Mumbai Suburban, Maharashtra | Rs 1,08,000 crore | Under Approvals |
| Refinery Project, Gudlur — New | Bharat Petroleum Corporation Limited | Nellore, Andhra Pradesh | Rs 1,03,408 crore | Under Approvals |
| Refinery & Petrochemical Complex, SPSR Nellore — New | Bharat Petroleum Corporation Limited | SPSR Nellore, Andhra Pradesh | Rs 1,03,408 crore | Under Approvals |
| Integrated Steel Plant, Mahakalpara — New | ArcelorMittal Nippon Steel India Limited | Kendrapara, Odisha | Rs 1,02,275 crore | Under Approvals |
| Nuclear Power Project, Madban Village, Ratnagiri [Jaitapur NPP — Unit VI] | Nuclear Power Corporation of India Limited (NPCIL) | Ratnagiri, Maharashtra | Rs 1,00,000 crore | Under Approvals |
| Rapid Rail Transit System, Delhi | National Capital Region Transport Corporation Limited | Delhi | Rs 1,00,000 crore | Planning |
| Rapid Rail Transit System, Delhi | National Capital Region Transport Corporation Limi | Delhi | Rs 1,00,000 crore | Under Approvals |
| Green Hydrogen & Green Ammonia Project, Kakinada | ReNew Power Private Limited | Kakinada, Andhra Pradesh | Rs 97,500 crore | Under Approvals |
What stands out is the concentration of mega-projects in power, connectivity and heavy industry — sectors that directly create demand for data centre infrastructure. Reliance Jio's Rs 1,71,000 crore optical fibre network, already under construction, represents the kind of backbone connectivity investment that precedes and accelerates hyperscale data centre deployments in the same geographies. Odisha, Maharashtra and Andhra Pradesh emerge repeatedly as high-investment states, signalling that data centre developers and their suppliers should be building relationships in these markets now rather than later.
Where data centre projects and related infrastructure tenders are concentrated
As the chart below shows, Maharashtra leads India's overall project count with 12,905 tracked projects, followed by Gujarat (7,061) and Karnataka (6,616). This broadly mirrors where data centre activity clusters: Maharashtra's Mumbai Metropolitan Region, Karnataka's Bengaluru corridor and Gujarat's industrial zones are consistently the most active geographies for commercial data centre announcements.
Uttar Pradesh (4,992 projects) and Andhra Pradesh (3,970 projects) round out the top five, both of which have seen active government-sponsored digital infrastructure investment. Tamil Nadu (3,406) and Telangana (3,106) are also significant — Chennai and Hyderabad in particular have emerged as Tier-1 data centre markets, and our records show sustained project activity across commercial and industrial construction in both states. For suppliers targeting data centre tenders specifically, monitoring commercial complex and business park tenders in these states will surface co-located or campus-style data centre opportunities early. You can explore upcoming industrial projects in Mumbai and Maharashtra and upcoming industrial projects in Andhra Pradesh for a closer look at the pipeline in those states.
Project stages: what the pipeline distribution means for contractors and equipment suppliers
Understanding where projects sit in the approval and construction lifecycle is essential for timing a sales or bidding approach. As the chart below shows, the largest cohort in our database — 35,864 projects — is currently Under Approvals, meaning active pre-tender preparation is under way for a very large number of schemes.
A further 17,589 projects are under active construction, representing the immediate demand window for fit-out contractors, mechanical and electrical sub-contractors, and equipment vendors. The 11,995 projects in Planning stage represent the next wave — organisations that enter these opportunities at the Planning stage have a meaningful window to position their technical specifications and pre-qualify before tenders are formally issued. Only 1,201 projects are at Near Completion stage, meaning the bulk of addressable demand is still open. For data centre-specific suppliers — whether UPS manufacturers, precision cooling vendors, structured cabling contractors or civil fit-out firms — the Under Approvals and Planning cohorts together represent the highest-value prospecting territory right now.
Projects added to the database recently
In the 90 days to 30 October 2026, Projects India added 633 new projects to the database — compared with 704 in the 90 days before that. Across recently added projects, our records show continued momentum in railway, road, residential and commercial construction. A selection of recent additions includes:
- Railway Line Expansion Project, Chennai, Tamil Nadu — Indian Railways — Rs 4,178 crore — Approvals Received
- Residential Complex Project, Bongaigaon, Assam (UDAY GREENS) — Uday Stonework Builders — Rs 8 crore — Construction Started
- Road Project, Badnawar, Madhya Pradesh — National Highways Authority of India — Rs 907 crore — Construction Started
- Commercial Complex Project, Noida, Uttar Pradesh (Max Square Two) — Max Estates — Construction Started
- Railway Project, Mumbai, Maharashtra — Western Railway — Rs 149 crore — Approvals Received
- Bio Medical Waste Treatment Project, Vidisha, Madhya Pradesh — Medical Pollution Control Committee — Rs 5 crore — Under Approvals
The commercial complex entry in Noida is the most directly relevant signal for data centre-adjacent suppliers: large commercial and mixed-use developments frequently incorporate dedicated server rooms, edge computing nodes or co-location facilities within their fit-out scope. Suppliers who track commercial complex tenders via our live government tenders feed will catch these requirements before they are broken into sub-contracts.
Most active promoters and what they buy
The promoters with the highest project counts in our database are predominantly government bodies — Public Works Department Maharashtra (862 projects), Uttar Pradesh Jal Nigam (853 projects), and National Highways Authority of India (790 projects, combined recorded cost Rs 6.54 lakh crore). On the private side, Indian Oil Corporation Limited accounts for 306 projects with a combined recorded cost of approximately Rs 2.39 lakh crore. As the chart below shows, government departments dominate project volume while private promoters account for a disproportionate share of total investment value.
For data centre contractors specifically, the relevance of government promoters is direct: central and state government bodies routinely issue tenders for server room upgrades, disaster recovery facility construction, and National Data Centre infrastructure under various digital mission programmes. Vendors who maintain pre-qualification status with state PWDs and central PSUs are better placed to be invited to bid on these contracts at short notice.
What this means for suppliers and contractors
The distribution of India's project pipeline across stages and geographies points to several concrete actions for firms pursuing data centre tenders in India:
- Planning and Under Approvals stage (combined 47,859 projects): This is the pre-tender window. Suppliers of precision cooling, generator sets, UPS systems, raised flooring, structured cabling and fire suppression should be engaging decision-makers now — providing technical input, submitting pre-qualification documents and getting on approved vendor lists. Waiting for the tender notice is too late in competitive categories.
- Construction Started (17,589 projects): Active construction projects are buying materials and services now. Civil and MEP sub-contractors, cable management suppliers, and testing and commissioning firms should be monitoring this cohort weekly. Procurement cycles at this stage move quickly.
- Commercial complex and business park tenders (3,228 tracked): Data centre fit-out opportunities are frequently embedded within broader commercial developments. Suppliers who focus only on projects labelled as data centres will miss a significant share of the actual market. Monitoring the Business/Commercial Complexes sub-sector is essential.
- Maharashtra, Karnataka and Gujarat: These three states account for more than 26,000 tracked projects combined. Any supplier or EPC firm without an established presence or channel partnership in these states is operating at a structural disadvantage in the data centre market.
- Government versus private promoters: Government-issued data centre tenders typically require GeM registration or standard tender pre-qualification; private hyperscale and co-location operators run proprietary RFP processes. Both pipelines need to be monitored separately and with different sales approaches.
How to track data centre tenders in India
Projects India maintains a verified database of 75,121 upcoming projects across all sectors, updated continuously as new tenders, approvals and construction notifications are issued. Contractors and equipment suppliers can filter the full upcoming projects database by state, stage, sub-sector and promoter type to build a qualified pipeline of data centre and commercial construction opportunities. The AI tender intelligence tool surfaces relevant tenders as soon as they are issued, reducing the time between publication and a qualified response. Teams that want to evaluate the data before committing can request a free sample project report to see the depth of information available on any single project — including contact details, scope descriptions, cost estimates and stage history. For firms that also need to find verified sub-contractors or equipment suppliers for awarded contracts, the VendorConnect contractor and supplier directory lists active firms by category and geography.
Frequently asked questions
How many data centre and related projects does Projects India currently track?
Projects India tracks 75,121 upcoming projects across all sectors in India as of 30 October 2026, with 18,889 verified. Data centre construction and fit-out tenders sit within the broader commercial and industrial project pipeline, which carries a combined recorded cost of approximately Rs 377.92 lakh crore.
Which states have the most data centre project activity in India?
Maharashtra (12,905 projects), Gujarat (7,061), Karnataka (6,616), Uttar Pradesh (4,992) and Andhra Pradesh (3,970) lead India's overall project pipeline. These states also correspond to the most active data centre markets — Mumbai, Bengaluru, Pune, Hyderabad, Noida and Chennai — based on commercial and industrial project concentration in our database.
What types of contracts are available for EPC contractors in data centre projects?
EPC contractors can pursue civil and structural construction, mechanical and electrical fit-out, precision cooling installation, structured cabling, raised flooring, fire suppression systems and testing and commissioning. Government-issued data centre tenders typically follow a public procurement process, while private operators use proprietary RFP formats. Both require early pre-qualification.
How do I find live government data centre tenders in India?
Projects India's live tenders feed tracks government-issued tenders across all sectors and states in real time. Suppliers can filter by sub-sector, state and stage to isolate data centre and commercial complex tenders. The AI tender intelligence tool alerts users as soon as a relevant tender is published, reducing response lag.
Which project stage should equipment suppliers target for data centre opportunities?
Suppliers should prioritise the Planning and Under Approvals stages — which together cover 47,859 projects in the current database — to engage before specifications are locked and approved vendor lists are finalised. Projects at Construction Started stage (17,589) represent immediate procurement demand for materials and services.
Are there data centre tenders from private companies as well as government bodies?
Yes. Both government agencies and private promoters issue data centre-related contracts. Government bodies such as state PWDs and central PSUs issue tenders for server room and national data centre infrastructure. Private hyperscale and co-location operators — which account for a large share of investment value in the database — run separate RFP processes that require vendor pre-qualification.
Get the project list for your sector
- Project name, promoter, cost, stage and location
- Verified decision-maker contacts
- Updated daily — plus live tenders