EPC Companies and Contractors in India: Directory 2026

Projects India tracks 74,876 upcoming projects across all sectors in India, with a combined recorded cost of around Rs 374.2 lakh crore. This directory maps the most active promoters, largest projects and highest-demand states to help EPC contractors and suppliers find work early.

NS
Nitisha ShindeResearch Desk, Projects India

8 min read · 1,587 words
EPC Companies and Contractors in India: Directory 2026

Projects India currently tracks 74,876 upcoming projects across all sectors in India, carrying a combined recorded cost of roughly Rs 374.2 lakh crore. Behind these projects sits a wide range of promoters — state public works departments, central utilities, private industrialists and urban local bodies — each of whom hires EPC contractors, PMC consultants, equipment suppliers and specialist subcontractors at different points in a project's life. This guide maps those buyers so that EPC companies and their B2B sales teams can reach them before a tender is issued.

Most Active Project Promoters in India

The table below lists the promoters with the highest number of projects in our database, drawn from records as of September 2026. Combined recorded cost covers only projects where a cost figure has been entered; the true portfolio of each promoter is larger.

Promoter Projects tracked Combined recorded cost
Public Works Department, Maharashtra 862 Rs 33,483 crore
Uttar Pradesh Jal Nigam 853 Rs 14,343 crore
National Highways Authority of India 786 Rs 6.49 lakh crore
Public Works Department, Odisha 728 Rs 14,259 crore
Public Works Department, Madhya Pradesh 520 Rs 15,277 crore
Karnataka Power Transmission Corporation Limited 409 Rs 2,871 crore
Drinking Water and Sanitation Department, Jharkhand 374 Rs 7,996 crore
Public Works Department, West Bengal 349 Rs 7,950 crore
Public Works Department, Tamil Nadu 340 Rs 8,770 crore
Public Health Engineering Department, Bihar 334 Rs 3,368 crore
Roads and Buildings Department, Gujarat 323 Rs 6,822 crore
Indian Oil Corporation Limited 306 Rs 2.39 lakh crore

The list is dominated by state-level civil engineering departments and water utilities, which together account for several thousand projects. Indian Oil Corporation Limited stands out as the largest single private-sector and central-PSU buyer in our database, with a recorded portfolio of Rs 2.39 lakh crore — directly relevant to EPC companies working in oil and gas, refinery, pipeline and terminal projects. National Highways Authority of India's Rs 6.49 lakh crore pipeline makes it the single largest recorded-cost promoter in the database, critical for road and bridge EPC contractors. For EPC companies seeking PMC or sub-contract roles in Maharashtra, or for PMC consultancy firms based in Mumbai, the Public Works Department, Maharashtra alone accounts for 862 tracked projects.

Largest Individual Projects EPC Contractors Should Watch

The projects below represent the highest-value upcoming opportunities in our database. Each one will require one or more EPC or engineering, procurement and construction management (EPCM) packages, along with specialist subcontractors and equipment suppliers across civil, mechanical, electrical and instrumentation disciplines.

Project Promoter Location Recorded cost Stage
Optical Fibre Cables Network Reliance Jio Infocomm Limited Maharashtra (multi-state) Rs 1,71,000 crore Construction Started
Cement Grinding Plant, Mahakalpara ArcelorMittal Nippon Steel India Limited Kendrapara, Odisha Rs 1,34,004 crore Under Approvals
Refinery & Petrochemical Complex, Vadinar — Expansion Nayara Energy Limited Devbhumi Dwarka, Gujarat Rs 1,30,000 crore Under Approvals
Captive Power Plant, Kamakhyanagar Vedanta Limited Dhenkanal, Odisha Rs 1,28,000 crore Under Approvals
Chemical & Petrochemical Mfg Unit, Santabommali Haldia Petrochemicals Limited Srikakulam, Andhra Pradesh Rs 1,20,000 crore Planning
Steel Plant, Kerjang Jindal Steel & Power Limited Angul, Odisha Rs 1,19,952 crore Construction Started (Dec 2026)
Mumbai–Ahmedabad High Speed Rail Corridor National High Speed Rail Corporation Limited Mumbai, Maharashtra Rs 1,08,000 crore Construction Started
Refinery & Petrochemical Complex, SPSR Nellore — New Bharat Petroleum Corporation Limited SPSR Nellore, Andhra Pradesh Rs 1,03,408 crore Under Approvals
Integrated Steel Plant, Mahakalpara ArcelorMittal Nippon Steel India Limited Kendrapara, Odisha Rs 1,02,275 crore Under Approvals
Jaitapur Nuclear Power Project — Unit VI Nuclear Power Corporation of India Limited Ratnagiri, Maharashtra Rs 1,00,000 crore Under Approvals
Rapid Rail Transit System, Delhi National Capital Region Transport Corporation Limited Delhi Rs 1,00,000 crore Planning / Under Approvals
Green Hydrogen & Green Ammonia Plant, Kakinada ReNew Power Private Limited Kakinada, Andhra Pradesh Rs 97,500 crore Under Approvals
Display Fab Unit, Hyderabad Foxconn Technology India Private Limited Hyderabad, Telangana Rs 94,500 crore Approvals Received

For EPC companies active in oil and gas, refining and petrochemicals, three projects alone — the Nayara Energy refinery expansion, the BPCL refinery at SPSR Nellore and the Haldia Petrochemicals complex in Srikakulam — represent a combined recorded value of over Rs 3.5 lakh crore. Tracking these projects from the Under Approvals stage, as our Project Tracker enables, gives contractors and vendors the lead time to register with the promoter's vendor qualification system before formal tendering begins.

Where Demand Is Concentrated: States and Project Stages

As the chart below shows, project activity is not spread evenly across India.

Upcoming projects by state — All sectors in India
Upcoming projects by state — All sectors in India — Maharashtra: 12,870; Gujarat: 7,021; Karnataka: 6,610; Uttar Pradesh: 4,969; Andhra Pradesh: 3,956; Madhya Pradesh: 3,903; Odisha: 3,598; Tamil Nadu: 3,397; Telangana: 3,098; West Bengal: 3,001Maharashtra12,870Gujarat7,021Karnataka6,610Uttar Pradesh4,969Andhra Pradesh3,956Madhya Pradesh3,903Odisha3,598Tamil Nadu3,397Telangana3,098West Bengal3,001
Source: Projects India database, September 2026

Maharashtra leads with 12,870 projects in our database, followed by Gujarat at 7,021 and Karnataka at 6,610. Uttar Pradesh, Andhra Pradesh and Madhya Pradesh each contribute between roughly 3,900 and 5,000 projects. Odisha, despite its smaller economy, hosts some of the country's largest individual capital expenditure projects in steel and power, making it disproportionately important for heavy-industry EPC contractors.

Stage matters as much as geography, as the chart below illustrates.

Projects by stage — All sectors in India
Projects by stage — All sectors in India — Under Approvals: 35,794; Construction Started: 17,491; Planning: 11,990; Completed: 8,583; Early / Announced: 4,358; Hold: 2,055; Approvals Received: 2,010; Nearly Completion: 1,178; Cancelled: 997Under Approvals35,794Construction Started17,491Planning11,990Completed8,583Early / Announced4,358Hold2,055Approvals Received2,010Nearly Completion1,178Cancelled997
Source: Projects India database, September 2026

Of the 74,876 upcoming projects in our database, the single largest group — 35,794 — is Under Approvals. Another 17,491 have Construction Started and 11,990 are at Planning stage. Projects at Approvals Received stage number 2,010, representing a group where detailed engineering and early procurement conversations are imminent. Only 1,178 are recorded as Nearly Completion, meaning the bulk of contracting opportunity across the market lies well ahead.

By sub-sector, real estate (10,801 projects) and other construction (10,211) dominate by volume. Water and sewerage pipeline and distribution projects number 7,499 — the largest single infrastructure sub-sector and the primary hunting ground for mid-tier civil and pipeline EPC contractors. Power distribution (4,689), roadways and highways (4,616) and railways (1,942) round out the picture for sector-specialist EPC firms. The full sub-sector breakdown is shown below.

Upcoming projects by sub-sector — All sectors in India
Upcoming projects by sub-sector — All sectors in India — Real Estate: 10,801; Other Construction Projects: 10,211; Water & Sewerage Pipeline & Distribution: 7,499; Power Distribution: 4,689; Roadways / Highways: 4,616; Business / Commercial Complexes: 3,199; Hospitals: 2,684; Other Industrial Projects: 2,344; Other Irrigation Projects: 2,206; Railways: 1,942Real Estate10,801Other Construction Projects10,211Water & Sewerage Pipeline & Distr…7,499Power Distribution4,689Roadways / Highways4,616Business / Commercial Complexes3,199Hospitals2,684Other Industrial Projects2,344Other Irrigation Projects2,206Railways1,942
Source: Projects India database, September 2026

How to Approach EPC Buyers and Project Promoters

Timing is the central variable in winning EPC or supply mandates. A project at Planning stage is too early for a tender but the right moment to establish a relationship with the promoter's engineering or procurement team. Projects at Under Approvals or Approvals Received stage are typically preparing detailed project reports and vendor lists; this is when pre-qualification submissions carry real weight. Once Construction Started is recorded, the primary EPC contracts are usually placed and the remaining opportunity lies in sub-packages, change orders and ongoing material supply.

Within a large project organisation, different buying decisions rest with different functions:

For government promoters such as state PWDs, NHAI or Karnataka Power Transmission Corporation Limited, the entry point is the published tender. Monitoring live government tenders across states gives contractors the earliest official signal. For private promoters such as Nayara Energy, Vedanta or Jindal Steel and Power, pre-tender engagement through vendor registration portals is the norm; tracking a project from Planning or Under Approvals stage in the projects intelligence database allows a sales team to initiate that outreach before the tender crowd assembles.

PMC consultancy firms, including those based in Mumbai serving Maharashtra's large project pipeline, are typically appointed before the EPC contractor. Identifying which projects are moving from Planning to Under Approvals is therefore the key trigger for PMC business development.

What This Means for EPC Suppliers and Contractors

Several practical conclusions follow from the data in our database.

Sector concentration: Water and sewerage, power distribution and roads collectively account for over 16,800 projects. Contractors with civil and pipeline capability have the widest addressable market. Oil and gas, refining and petrochemical EPC contractors face fewer but far larger individual projects — the Nayara Energy, BPCL and Haldia Petrochemicals projects alone represent enormous scopes — so early-stage monitoring and prompt vendor registration are essential.

State prioritisation: Maharashtra, Gujarat, Karnataka, Uttar Pradesh and Andhra Pradesh together hold more than 35,000 of the 74,876 tracked projects. An EPC company or equipment supplier that lacks a registered office or a business-development presence in at least two of these states is operating at a disadvantage when responding to tenders that require local presence or experience.

Recently added projects as early signals: Our database added 573 new projects in the 90 days to September 2026, including a Rs 5,000 crore captive power plant and a Rs 5,000 crore steel plant, both by Shakambhari Ispat and Power Limited in Bihar, both at Planning stage. Projects at this stage rarely appear on any screener or PDF list circulated through industry networks. Catching them early is the core use case of a live project-intelligence platform.

Using the directory alongside project data: Knowing which promoter is active tells you who to call; knowing which contractors have been awarded work in a given sector tells you who the sub-contract and supply chain opportunity sits with. The contractor and supplier directory (VendorConnect) on Projects India maps registered companies by capability and geography, allowing suppliers to identify which EPC contractors are active on projects in their region and initiate conversations before the sub-contract tender is floated.

EPC companies that want to see the full list of upcoming projects by sector, state or promoter — beyond what any static PDF or stock-screener can show — can browse the all upcoming projects in India page or request a free sample project report to assess the depth of data before subscribing.

Frequently asked questions

How many EPC and construction projects are currently tracked in India?

Projects India tracks 74,876 upcoming projects across all sectors in India as of September 2026, with a combined recorded cost of around Rs 374.2 lakh crore. Of these, 18,657 are marked as verified. A further 8,583 completed and 997 cancelled projects are also held in the database for benchmarking.

Which are the top EPC companies and project promoters in India by project volume?

By number of projects tracked, the most active promoters include Public Works Department Maharashtra (862 projects), Uttar Pradesh Jal Nigam (853), National Highways Authority of India (786) and Public Works Department Odisha (728). Indian Oil Corporation Limited leads among central PSUs and private-sector buyers with 306 projects worth Rs 2.39 lakh crore.

Which states have the most EPC and infrastructure projects in India?

Maharashtra leads with 12,870 projects, followed by Gujarat at 7,021 and Karnataka at 6,610. Uttar Pradesh has 4,969, Andhra Pradesh 3,956 and Madhya Pradesh 3,903. Odisha, while ranked seventh by project count at 3,598, hosts several of the country's largest individual capital projects in steel and power.

Where can I find EPC companies in India working in oil and gas?

The largest oil and gas and petrochemical projects in our database include Nayara Energy's refinery expansion in Gujarat (Rs 1,30,000 crore), BPCL's new refinery in Andhra Pradesh (Rs 1,03,408 crore) and Haldia Petrochemicals' complex in Srikakulam (Rs 1,20,000 crore). Indian Oil Corporation Limited has 306 projects recorded, making it the leading central PSU buyer in this space.

What is the difference between a project at Planning stage and one at Construction Started?

A project at Planning stage is in early feasibility or DPR preparation; EPC and vendor mandates have not been awarded. Construction Started means main contracts are largely placed. Our database shows 11,990 projects at Planning, 35,794 Under Approvals and 17,491 at Construction Started — each stage represents a different sales entry point.

How do PMC consultancy firms in Mumbai find new mandates early?

PMC consultants are typically appointed before EPC contractors, making the Planning and Under Approvals stages the critical window. Public Works Department Maharashtra alone has 862 tracked projects. Monitoring the projects intelligence database by stage and state allows PMC firms to identify and approach promoters before a formal appointment process begins.

Find projects before your competitors do

Project names, promoters, cost, stage and verified decision-maker contacts — plus live tenders, updated every day.

NS
About the authorNitisha Shinde · Research Desk, Projects India

Nitisha Shinde leads the research desk at Projects India, which tracks upcoming private and government projects, tenders and awarded contracts across 51 sectors in India.

This article was drafted with AI assistance from Projects India's own project and tender records, then reviewed and approved by our research desk before publication.

More from Insights

New EPC Projects in India: Power, Industry & Infrastructure
Infrastructure Projects in India: Roads, Ports & Urban Leads
Upcoming Power Projects in India: Thermal, Hydro & Wind