GAIL Proposes Rs 123-Crore CBG Facility in Bengaluru
State-owned gas major GAIL has proposed a compressed biogas (CBG) plant in Bengaluru, with an investment reported at Rs 123.42 crore by Business Upturn and at approximately Rs 123 crore by BioEnergy Times, both reporting on 12 November 2026. Both outlets confirm the plant will use municipal waste as feedstock. No further details on capacity, site location within the city, or project stage were available from the headlines at the time of publication.
| Detail | Information |
|---|---|
| Project | Compressed Biogas Plant |
| Promoter | GAIL |
| Location | Bengaluru, Karnataka |
| Feedstock | Municipal waste |
| Investment | Rs 123 crore – Rs 123.42 crore (as reported) |
| Stage | Proposed / Early |
GAIL's Broader Project Footprint
Projects India tracks several other investments by GAIL across energy infrastructure. These include a natural gas pipeline project at Paradeep, Odisha; a pipeline project in Krishnagiri, Tamil Nadu; an ammonia project in Vidarbha, Nagpur valued at Rs 10,000 crore; and two solar power projects — one in Jhansi, Uttar Pradesh and one in Chhatrapati Sambhaji Nagar, Maharashtra — each valued at Rs 3,800 crore. The Bengaluru CBG proposal marks the company's entry into the biomass sub-sector within the Projects India database.
Karnataka Within a Growing Biomass Pipeline
Karnataka is an active state for non-conventional biomass power projects in India. Projects India tracks 162 live projects in this sub-sector nationally, of which 15 have been added in the last 90 days. Karnataka accounts for 18 of the tracked projects, placing it third nationally behind Maharashtra (30 projects) and Gujarat (20 projects), and ahead of Andhra Pradesh (15), Punjab (13) and Madhya Pradesh (11).
Recent CBG activity in Bengaluru itself has been notable. Two separately tracked projects — both valued at Rs 160 crore and located near Kudlu — have been reported in the city, as covered in earlier Projects India news items on a Rs 160-crore CBG plant set to receive a foundation stone and a waste-to-biogas plant planned near Kudlu. The GAIL proposal, if it proceeds, would add a third municipal-waste-based CBG investment to the city's emerging biogas cluster.
Stage Breakdown: Where the Pipeline Stands Nationally
Of the 162 biomass sub-sector projects tracked by Projects India, the largest share — 62 — remain under approvals, reflecting regulatory and clearance processes that are common at this stage of project development. A further 24 are in planning and 15 have reached construction. Twenty-four projects are recorded as completed and 15 are on hold, while 11 have been cancelled. For suppliers and contractors, this distribution signals that a significant volume of work is approaching procurement and construction readiness, particularly among projects currently under approvals. Bioenergy investment momentum more broadly has been captured in the REI Expo 2026 bioenergy investment pipeline report tracked by Projects India.
What this means for suppliers and contractors
The GAIL proposal in Bengaluru is relevant to suppliers and contractors active in compressed biogas plant construction, municipal solid waste processing equipment, gas upgrading systems and civil works. Karnataka's position as the third-most-active state in the biomass sub-sector — with 18 tracked projects — means the GAIL plant, if it advances, would join an established local project environment rather than an isolated opportunity.
Nationally, the concentration of 62 projects still under approvals represents a near-term pipeline for equipment and service providers to monitor. The states with the heaviest concentration — Maharashtra, Gujarat and Karnataka — are where early-stage supplier engagement is likely to yield the most leads. Projects India currently records no open tenders in the broader power projects sector, but the biomass sub-sector's approval-stage backlog suggests tender activity is likely to build as projects clear regulatory hurdles.
For contractors experienced in CBG plant construction, the range of project sizes now being announced — from Rs 17 crore at Ludhiana to Rs 123 crore in Bengaluru and Rs 100 crore in Gujarat — indicates demand across small, mid and larger-scale facilities, broadening the addressable market.
Frequently asked questions
How much is GAIL investing in the Bengaluru biogas plant?
GAIL's proposed compressed biogas plant in Bengaluru has been reported at Rs 123.42 crore by Business Upturn and at approximately Rs 123 crore by BioEnergy Times, both on 12 November 2026. The plant is to be based on municipal waste feedstock.
What feedstock will the GAIL Bengaluru CBG plant use?
Both outlets reporting on the GAIL Bengaluru project confirmed the plant will use municipal waste as its feedstock for compressed biogas production. No further technical details were available from the published headlines.
How many biomass power projects are tracked in Karnataka?
Projects India tracks 18 non-conventional biomass power projects in Karnataka, placing the state third nationally behind Maharashtra with 30 and Gujarat with 20 in this sub-sector.
What is the current stage of most biomass projects in India?
Of 162 biomass sub-sector projects tracked by Projects India, 62 are under approvals — the largest single stage. Fifteen are in construction, 24 in planning and 24 are completed, with 15 on hold and 11 cancelled.


