Projects India tracks 4,689 upcoming power distribution and transmission projects across India, with a combined recorded cost of about Rs 5.95 lakh crore. This guide lists the most active promoters, largest individual projects and states with the highest demand.
8 min read · 1,459 words
Projects India currently tracks 4,689 upcoming power distribution and transmission line projects across India, with a combined recorded cost of about Rs 5.95 lakh crore. The buyers behind these projects are overwhelmingly state power transmission and distribution utilities, alongside the central government's Power Grid Corporation of India Limited — making this one of the most procurement-active sectors in our database.
Most Active Promoters of Transmission Line Projects in India
The table below lists the promoters with the highest number of active and upcoming projects that Projects India tracks in the power distribution and transmission scope. State utilities dominate the list, each responsible for a distinct territory and its associated network expansion and upgradation works.
| Promoter | Projects tracked | Combined recorded cost |
|---|---|---|
| Karnataka Power Transmission Corporation Limited | 405 | About Rs 2,615 crore |
| Odisha Power Transmission Corporation Limited | 288 | About Rs 9,528 crore |
| Paschimanchal Vidyut Vitran Nigam Limited | 225 | About Rs 5,282 crore |
| Maharashtra State Electricity Distribution Company | 212 | About Rs 14,121 crore |
| Transmission Corporation of Andhra Pradesh Limited | 192 | About Rs 8,654 crore |
| Dakshinanchal Vidyut Vitran Nigam Limited | 169 | About Rs 2,351 crore |
| Power Grid Corporation of India Limited | 164 | About Rs 2.25 lakh crore |
| Bihar State Power Transmission Company Limited | 156 | About Rs 9,082 crore |
| Maharashtra State Electricity Transmission Company | 155 | About Rs 10,747 crore |
| Jharkhand Bijli Vitran Nigam Limited | 125 | About Rs 12,773 crore |
| Uttar Pradesh Power Transmission Corporation Limited | 123 | About Rs 496 crore |
| Transmission Corporation of Telangana Limited | 121 | About Rs 3,807 crore |
As the chart below shows, the spread of project activity across promoters reflects the decentralised nature of India's power sector, where state-level entities and the central utility each manage distinct pipeline volumes.
Power Grid Corporation of India Limited stands apart in terms of recorded cost — its 164 tracked projects carry about Rs 2.25 lakh crore in combined value, reflecting the scale of inter-state and high-voltage transmission corridors it develops. State utilities such as Karnataka Power Transmission Corporation Limited and Odisha Power Transmission Corporation Limited lead on project count, indicating sustained intra-state network expansion. EPC contractors and equipment suppliers targeting volume should map coverage across multiple state utilities, while those pursuing high-value individual contracts should focus on Power Grid Corporation tenders. The full contractor and supplier directory on Projects India allows suppliers to cross-reference these promoters against tendered packages.
Largest Individual Transmission Line Projects in India
The projects below represent the highest recorded-cost entries within the power distribution and transmission scope that our database tracks. Contractors and suppliers evaluating bid opportunities should note the stage of each project, which determines how close procurement is to opening.
| Project | Promoter | Location | Recorded cost | Stage |
|---|---|---|---|---|
| Transmission line Project at Pugalur–Raigarh (CHHAT)–Tiruchchirappalli | Power Grid Corporation of India Limited | Raigarh (CHHAT), Chhattisgarh | Rs 14,733 crore | Construction Started |
| Transmission line Project at Pugalur–Raigarh (CHHAT)–Tiruchchirappalli | Power Grid Corporation of India Limited | Tiruchchirappalli, Tamil Nadu | Rs 14,733 crore | Construction Started |
| Power Distribution Project at Chhattisgarh–Haryana | Power Grid Corporation of India Limited | Maharashtra | Rs 11,500 crore | Planning |
| Power Distribution Project at Kahalgaon–North Karanpura–Barh | Power Grid Corporation of India Limited | Bhagalpur, Chatra, Patna | Rs 9,200 crore | Construction Started |
| Power Distribution Project at Amaravati | Andhra Pradesh Capital Region Development Authority | Amaravati, Andhra Pradesh | Rs 7,500 crore | Under Approvals |
| Power distribution Project at North-East States | Power Grid Corporation of India Limited | Assam | Rs 6,653 crore | Construction Started |
| Power Distribution Project at Satna–Jabalpur–Agra–Jalaun–Kanpur (Dehat) | Power Grid Corporation of India Limited | Satna, Jabalpur, Agra, Jalaun, Kanpur (Dehat) | Rs 6,517 crore | Construction Started |
| Power Distribution Project at Malerkotla–Sangrur–Unnao–Meerut–Agra–Ballia | Power Grid Corporation of India Limited | Sangrur, Unnao, Meerut, Agra, Ballia | Rs 6,200 crore | Construction Started |
Several of these projects span multiple states, meaning a single contract can require mobilisation across two or more circles. Contractors without multi-state execution capability may be better suited to sub-packages or equipment supply rather than the main EPC lot. Detailed project reports for these and other entries are available via the free sample project report on Projects India.
Where Demand for Transmission Line Contractors Is Concentrated
Uttar Pradesh leads in project count with 720 projects, followed by Maharashtra with 621 and Karnataka with 509, as the chart below shows. Bihar, Odisha and Jharkhand together account for a further 913 projects, reflecting the infrastructure buildout underway in eastern India. Rajasthan, Andhra Pradesh, Telangana and Madhya Pradesh each carry between 173 and 208 tracked projects, indicating sustained procurement pipelines outside the top three states.
In terms of project stage, the largest share of projects in our database sits at Under Approvals (3,263 projects), which means clearances are pending but procurement has not yet opened. A further 874 projects are at Construction Started, indicating active site work and ongoing or imminent procurement of materials and sub-contractor packages. Projects at the Planning stage (366) represent the early pipeline where relationship-building with project owners is most valuable.
For EPC contractors and power line contractors evaluating where to register vendor approvals, state utilities in Uttar Pradesh, Maharashtra, Karnataka and Odisha represent the deepest pipelines. Suppliers of conductors, towers, insulators, cables and switchgear should prioritise vendor registration with the promoters in these states before procurement cycles open. The full list of power distribution projects in India on Projects India can be filtered by state, stage and promoter to support this analysis.
How to Approach Transmission Line Project Owners
The stage of a project determines which team members are in procurement mode and what kind of engagement is appropriate.
- Planning and Early / Announced: At this stage, a project owner is scoping requirements, preparing detailed project reports and identifying vendors. This is the right time for EPC contractors, consultants and key equipment suppliers to introduce their capabilities. Procurement has not opened, but technical discussions and pre-qualification submissions may be accepted.
- Under Approvals: The project is awaiting statutory or financial clearances. Engagement with the promoter's engineering and procurement teams is useful here. Monitoring tender releases through a platform such as the live government tenders section on Projects India allows contractors to respond quickly when notices are issued.
- Approvals Received: Clearances are in hand and the project is moving toward tendering. Contractors should ensure pre-qualification documentation, financial statements and equipment tie-ups are current.
- Construction Started: The main EPC award has typically already been made. Opportunities at this stage are primarily for sub-contractors, equipment and material suppliers, and service providers responding to the main contractor's procurement. Approaching the awarded EPC contractor — rather than the promoter — is the more effective route.
For state utility projects, procurement contacts typically sit within the chief engineer (projects) or general manager (contracts) function. For Power Grid Corporation of India Limited, regional executive directors and procurement heads manage large transmission packages. Vendor registration processes differ by organisation; checking each utility's official portal and following tender notices is the standard entry point.
What This Means for Suppliers and Contractors
For EPC contractors and power line contractors, the pipeline of 4,689 upcoming projects tracked by Projects India represents one of the most active civil–electrical construction markets in the country. The concentration of projects at the Under Approvals stage means a large volume of tendering is approaching but has not yet opened — giving contractors time to prepare technical and financial pre-qualification documents, secure equipment supply agreements and finalise sub-contractor tie-ups.
For equipment and material suppliers — including those in the list of cable manufacturers in India, conductor producers, tower fabricators and transformer manufacturers — the active construction projects (874 in our database) are the immediate priority. Main EPC contractors on these packages are currently procuring. Understanding which EPC company holds a given contract, and approaching their procurement team directly, shortens the sales cycle considerably. The projects intelligence database on Projects India links project records to contractor information to support exactly this kind of outreach.
For consultants and sub-contractors, the spread across states suggests that regional presence matters. A consultant or niche contractor active in Uttar Pradesh, Maharashtra and Karnataka simultaneously has access to the three largest state pipelines. Smaller contractors serving a single state can focus on their home utility's pipeline, which in the case of Karnataka Power Transmission Corporation Limited alone runs to 405 tracked projects.
Five new projects were added to our database in the 90 days before September 2026, and the same number in the 90 days prior — indicating steady rather than sudden intake in this scope. Suppliers should therefore treat the existing pipeline as the primary opportunity set rather than waiting for a single large batch of new additions. Monitoring project stages as they move from Under Approvals to Approvals Received to tender release is the most reliable way to time engagement. The AI tender intelligence tool on Projects India automates this tracking across the full database of 84,445 nationally tracked projects, alerting users when relevant projects progress or when new tenders are issued.
Frequently asked questions
How many transmission line projects are currently active in India?
Projects India tracks 4,689 upcoming power distribution and transmission projects across India as of September 2026, with a combined recorded cost of about Rs 5.95 lakh crore. Of these, 874 are at the Construction Started stage, indicating active site work and ongoing procurement.
Which states have the most transmission line projects in India?
Uttar Pradesh leads with 720 projects, followed by Maharashtra with 621 and Karnataka with 509. Other high-activity states include Odisha (347), Bihar (336), Jharkhand (230), Telangana (208), Andhra Pradesh (181), Rajasthan (177) and Madhya Pradesh (173), according to Projects India's database.
Who are the top promoters of transmission line projects in India?
Karnataka Power Transmission Corporation Limited leads on project count with 405 projects, followed by Odisha Power Transmission Corporation Limited (288) and Paschimanchal Vidyut Vitran Nigam Limited (225). By recorded cost, Power Grid Corporation of India Limited is the largest single promoter at about Rs 2.25 lakh crore across 164 projects.
What is the largest transmission line project in India right now?
The Pugalur–Raigarh (CHHAT)–Tiruchchirappalli transmission line project, promoted by Power Grid Corporation of India Limited, carries a recorded cost of Rs 14,733 crore and is currently at the Construction Started stage, spanning Chhattisgarh and Tamil Nadu.
How can equipment suppliers and cable manufacturers find transmission line contracts in India?
Suppliers should identify which EPC contractor holds the main award on projects at the Construction Started stage and approach their procurement teams directly. For projects still Under Approvals, vendor registration with state utilities is the priority. Projects India's projects intelligence database links project records to contractor information for this purpose.
Which government agencies issue transmission line tenders in India?
The main public buyers are Power Grid Corporation of India Limited at the central level, and state utilities such as Karnataka Power Transmission Corporation Limited, Odisha Power Transmission Corporation Limited, Maharashtra State Electricity Transmission Company and Bihar State Power Transmission Company Limited, among others tracked in Projects India's database.
Get the full list of 4,765 Power Distribution projects in India
Project names, promoters, cost, stage and verified decision-maker contacts — plus live tenders, updated every day.