List of Thermal Power Plants in India: Buyer's Guide
Projects India tracks 927 upcoming thermal power projects across India worth a combined Rs 44.42 lakh crore. This guide names the most active promoters, the largest individual projects and where procurement opportunities are concentrated.
9 min read · 1,659 words
India's pipeline of thermal power plants is substantial: Projects India currently tracks 927 upcoming thermal-based power projects across the country, with a combined recorded project cost of approximately Rs 44.42 lakh crore. The promoters behind these projects range from central public-sector undertakings and state generation utilities to private independent power producers. For EPC contractors, equipment suppliers and B2B sales teams, understanding who is building what — and at what stage — is the starting point for every sales conversation.
Most Active Thermal Power Companies in India
The table below draws on our database to show the promoters with the highest number of thermal power projects we track. State utilities and central PSUs dominate the list by project count, though several private players are also active at significant scale.
| Promoter | Projects tracked | Combined recorded cost |
|---|---|---|
| NTPC Limited | 43 | About Rs 2.48 lakh crore |
| Bermaco Energy Systems Limited | 36 | — |
| Maharashtra State Power Generation Company Limited | 24 | About Rs 12,112 crore |
| NLC India Limited | 17 | About Rs 1.16 lakh crore |
| Telangana State Power Generation Corporation Limited (TS Genco) | 16 | About Rs 1.3 lakh crore |
| India Power Corporation Limited | 14 | About Rs 14,400 crore |
| Tamil Nadu Generation and Distribution Corporation | 13 | About Rs 1.13 lakh crore |
| Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited | 13 | About Rs 54,345 crore |
| Gujarat State Electricity Corporation Limited | 12 | About Rs 68,462 crore |
| Jinbhuvish Power Generations Private Limited (JPGPL) | 11 | About Rs 1.05 lakh crore |
| Bermaco Energy Limited | 11 | About Rs 270 crore |
| Andhra Pradesh Power Generation Corporation Limited (APGENCO) | 11 | — |
NTPC Limited leads both by project count and by recorded capital outlay at Rs 2.48 lakh crore — the largest combined spend of any single promoter in our thermal power database. Among state utilities, TS Genco and Tamil Nadu Generation and Distribution Corporation each carry combined pipelines exceeding Rs 1 lakh crore. As the chart below shows, the promoter landscape is diverse, with no single organisation accounting for a majority of project activity.
Largest Upcoming Thermal Power Plant Projects in India
The table below lists the highest-value individual projects in our thermal-based power projects database, drawn from verified and tracked records. Projects where the promoter name makes the sector obvious have been prioritised; the largest projects by recorded cost are listed below.
| Project | Promoter | Location | Recorded cost | Stage |
|---|---|---|---|---|
| Thermal Based Power Unit Project at Polaki Mandal, Srikakulam | Andhra Pradesh Power Generation Corporation Limited | Srikakulam, Andhra Pradesh | Rs 66,538 crore | Under Approvals |
| Coal Based Thermal Power Plant at Bijora, Yavatmal – Phase II | Jinbhuvish Power Generations Private Limited (JPGPL) | Yavatmal, Maharashtra | Rs 35,000 crore | Approvals Received |
| Coal Based Power Unit at Patratu, Hazaribagh | Patratu Vidyut Utpadan Nigam Limited | Hazaribagh, Jharkhand | Rs 32,000 crore | Under Approvals |
| Coal Based Power Unit 1 at Nayunipalli Village, Prakasam | Andhra Pradesh Power Generation Corporation Limited | Nayunipalli Village, Andhra Pradesh | Rs 32,000 crore | Planning |
| Thermal Power Project at Dameracherla, Nalgonda | Telangana State Power Generation Corporation Limited | Nalgonda, Telangana | Rs 30,000 crore | Under Approvals |
| Coal Based Thermal Power Plant at Kakwara Village, Banka – Unit V | Bihar Mega Power Limited | Banka, Bihar | Rs 30,000 crore | Under Approvals |
| Coal Based Power Unit at Sundargarh, Odisha | Orissa Integrated Power Limited | Sundargarh, Odisha | Rs 29,000 crore | Under Approvals |
| Coal Based Thermal Power Project at Kutch – Unit I | Nana Layja Power Company Limited | Kutch, Gujarat | Rs 28,000 crore | Under Approvals |
| Super Thermal Power Project at Jamnagar – Phase I, Unit I | Universal Crescent Power Private Limited | Jamnagar, Gujarat | Rs 25,248 crore | Under Approvals |
| Super Critical Coal Based Thermal Power Project at Veerlapalem Village, Nalgonda – Unit IV | Telangana State Power Generation Corporation Limited (TS Genco) | Nalgonda, Telangana | Rs 25,099.42 crore | Approvals Received |
| Coal Based Power Unit 4 at Damaracherla, Nalgonda | Telangana State Power Generation Corporation Limited | Damaracherla, Telangana | Rs 25,099 crore | Construction Started |
Several of these projects are at the Under Approvals or Approvals Received stage, meaning formal procurement has not yet opened. Two TS Genco units at Damaracherla have already moved to Construction Started, making them immediate targets for sub-contractors and equipment vendors.
Where Thermal Power Demand Is Concentrated: States and Project Stages
Odisha, Tamil Nadu, Chhattisgarh, Andhra Pradesh and Bihar collectively account for a large share of the thermal power projects our records show, as the chart below illustrates. Madhya Pradesh, Gujarat, Maharashtra, Uttar Pradesh and Jharkhand are the next tier of activity.
Among the recent additions to our database — 13 projects added in the last 90 days — several are already at advanced stages. Torrent Power Limited has a new project in construction at Anuppur, Madhya Pradesh (Rs 22,000 crore), and a separate project at Raigarh, Chhattisgarh (Rs 22,915 crore) at Under Approvals stage. MP Power Management Company Limited has a Rs 23,000 crore project listed as Daikhal, Madhya Pradesh, also at Construction Started. UP Rajya Vidyut Utpadan Nigam Limited's expansion at Obra, Sonbhadra is at Approvals Received at Rs 11,706 crore, and NTPC Limited has filed for approvals on an expansion at Unchahar, Raebareli worth Rs 2,901 crore.
Across all projects in our thermal power scope — including completed and cancelled ones — the largest single stage by count is Under Approvals (503 projects), followed by Completed (193) and Construction Started (144). As the chart below shows, there is a large body of projects in earlier pipeline stages that will progressively enter procurement cycles.
Of the 927 upcoming projects, 222 are marked as verified in our database, meaning the project details have been confirmed through primary sources. Thirteen projects were added to our records in the most recent 90-day window, against one in the prior 90 days — a signal of renewed activity in the pipeline. For more on project activity in a specific geography, the thermal power plants in Assam guide covers that state in detail.
How to Approach These Companies
Timing is everything when selling to thermal power promoters. The right moment to engage depends on what a project's current stage tells you about where it is in its procurement cycle.
- Planning and Early / Announced: Projects at this stage are conceptual. The promoter's engineering or business development team is the relevant contact. Relationship-building, technical pre-qualification and expression-of-interest conversations are appropriate. Hard commercial proposals are premature.
- Under Approvals: Environmental, land and statutory clearances are in progress. This is the stage at which feasibility studies are commissioned, long-lead equipment lists are sometimes prepared, and detailed project reports are finalised. Consultants and technology licensors are frequently engaged here.
- Approvals Received: Clearances are in hand. The promoter's project team is typically preparing EPC tender packages or equipment bid documents. This is a high-priority window for EPC contractors and major equipment suppliers — entering the vendor approved list at this point often determines whether a company is invited to bid.
- Construction Started: Main EPC or supply contracts may already be placed, but balance-of-plant packages, civil sub-contracts, instrumentation, electrical and O&M service contracts are still being issued. Suppliers of consumables, structural steel, cabling and site services should be active at this stage.
- Nearly Completion: Commissioning and testing vendors, O&M spares suppliers and water-treatment chemical vendors are relevant here.
Within a project organisation, procurement authority typically sits with the head of contracts or chief procurement officer for large packages, while equipment-level purchasing may reside with the head of mechanical or electrical engineering. For state utilities, finance departments often have a veto on vendor approval. For a detailed look at the EPC contracting landscape, our companion guide covers that angle specifically.
Checking live government tenders for state utility names — APGENCO, TS Genco, Mahagenco, TANGEDCO, UPRVUNL and others — is a practical first step once a project moves to Approvals Received or beyond. Central PSU tenders from NTPC and NLC India are published on their own portals as well as on government e-procurement platforms.
What This Means for Suppliers and Contractors
The scale of India's thermal power pipeline — Rs 44.42 lakh crore across 927 upcoming projects — represents a broad and sustained procurement market. Several points are worth noting for sales and business-development teams.
- State utilities are the dominant buyers. NTPC, NLC India, TS Genco, Mahagenco, TANGEDCO, GSECL and UPRVUNL collectively account for a substantial share of project count and cost in our database. Each has established supplier registration processes that must be completed before a company can bid. Initiating registration while a project is still Under Approvals avoids disqualification later.
- Private IPPs require a different approach. Companies such as Jinbhuvish Power Generations Private Limited, Universal Crescent Power Private Limited and Nana Layja Power Company Limited are private developers. Their procurement processes are less standardised than public utilities, and direct engagement with their project management teams is often more effective than waiting for published tenders.
- Odisha, Andhra Pradesh, Chhattisgarh and Bihar are volume markets. Suppliers with regional presence or established logistics in these states are better positioned to service multiple projects from the same location.
- Supercritical technology is prevalent in new builds. Projects such as the TS Genco Veerlapalem units are specified as supercritical, which affects the grade and specification of boiler, turbine and generator components required. Suppliers should confirm technology specifications before quoting.
- Expansion projects move faster than greenfield. The Obra expansion by UPRVUNL and the Unchahar expansion by NTPC are both at advanced stages. Existing site infrastructure reduces construction timelines, compressing the window between approval and first procurement action.
For teams that need to track projects across the full power sector — not just thermal — Projects India's database covers 84,943 projects nationally. Thermal-based power is one segment within a wider power pipeline that includes transmission, distribution and renewable energy. The coal mining contractors guide is a useful companion for suppliers whose products serve both fuel extraction and power generation.
To view the full list of thermal power plants in India with project-level details, promoter contacts and procurement stage, the thermal-based power projects section of our database is the starting point. A free sample project report is available for teams that want to evaluate the depth of data before subscribing.
Frequently asked questions
How many thermal power plants and projects are currently tracked in India?
Projects India tracks 927 upcoming thermal-based power projects across India as of November 2026. Of these, 222 are marked as verified. The combined recorded project cost of those with a cost on file is approximately Rs 44.42 lakh crore.
Which are the largest thermal power companies in India by number of projects?
NTPC Limited leads with 43 projects and a combined recorded cost of about Rs 2.48 lakh crore. Bermaco Energy Systems Limited tracks 36 projects, followed by Maharashtra State Power Generation Company Limited (24 projects), NLC India Limited (17) and TS Genco (16), based on data in our database.
Which states have the most upcoming thermal power plant projects?
Odisha leads with 95 projects in our records, followed by Tamil Nadu (80), Chhattisgarh (78), Andhra Pradesh (77), Bihar (77), Madhya Pradesh (73), Gujarat (71), Maharashtra (68), Uttar Pradesh (55) and Jharkhand (48).
What is the largest upcoming thermal power project in India by cost?
The highest-cost project in our database is the Thermal Based Power Unit Project at Polaki Mandal, Srikakulam, Andhra Pradesh, promoted by Andhra Pradesh Power Generation Corporation Limited, with a recorded cost of Rs 66,538 crore. It is currently Under Approvals.
Which thermal power projects recently entered construction in India?
Among projects added to our database in the last 90 days, Torrent Power Limited's project at Anuppur, Madhya Pradesh (Rs 22,000 crore) is at Construction Started stage, and MP Power Management Company Limited's project listed as Daikhal, Madhya Pradesh (Rs 23,000 crore) is also at Construction Started stage.
Where can I find a list of thermal power plants in India with contact and procurement details?
Projects India's thermal-based power projects database provides project-level records including promoter, location, cost, stage and procurement contacts for 927 upcoming projects. A free sample project report is available to evaluate the data before subscribing.
Get the full list of 1,259 Thermal Based Power projects in India
- Project name, promoter, cost, stage and location
- Verified decision-maker contacts
- Updated daily — plus live tenders