SRM Contractors Secures Rs 1.38 Billion MORTH Award in Uttarakhand
SRM Contractors has secured a contract worth Rs 1.38 billion from the Ministry of Road Transport and Highways (MORTH) for a bridge project in Uttarakhand, as reported on 30 October 2026. No further details of the project scope, location within the state, or timeline were available at the time of publication.
| Detail | Information |
|---|---|
| Contractor | SRM Contractors |
| Client / Promoter | Ministry of Road Transport and Highways (MORTH) |
| State | Uttarakhand |
| Contract Value | Rs 1.38 billion |
| Sub-sector | Bridges |
Uttarakhand in the Broader Bridges Pipeline
The award adds to an active construction environment in Uttarakhand's bridge segment. Projects India already tracks a bridge project at Tapovan, Rishikesh, Uttarakhand — the Laxman Jhula Bridge — promoted by the Public Works Department at a value of Rs 54.97 crore, currently at the construction-started stage. The MORTH contract secured by SRM Contractors represents a separate, additional award in the same state.
Across India, Projects India tracks 30 live bridge projects, with three added in the last 90 days, reflecting a steady flow of new work entering the pipeline.
Stage Breakdown: Where the National Pipeline Stands
Of the 30 bridge projects currently tracked by Projects India, the stage distribution is as follows:
- Construction Started: 17 projects — the largest share, indicating a high volume of active on-site work across the country.
- Under Approvals: 5 projects — representing near-term opportunities for contractors and equipment suppliers as these move toward tendering.
- Nearly Completion: 3 projects — potential sources of follow-on maintenance or ancillary contracts.
- Approvals Received: 2 projects — likely to enter procurement shortly.
- Planning: 1 project — at the earliest stage of development.
- Completed: 2 projects.
The dominance of the construction-started stage signals continued demand for structural steel, formwork, concrete, and specialist bridge-construction services in the near term.
Geographic Concentration of Bridge Activity
State-level data from Projects India reveals where bridge construction activity is currently concentrated across the country:
- Madhya Pradesh: 6 projects
- Maharashtra: 5 projects
- Uttar Pradesh: 4 projects
- Bihar: 3 projects
- Assam: 2 projects
- Gujarat: 2 projects
Madhya Pradesh leads the tally, followed closely by Maharashtra. Suppliers and contractors looking to align resources with active project clusters may find these states particularly productive to target. The MORTH award in Uttarakhand, while outside the top-ranked states by volume, is consistent with the ministry's broad national mandate for road and bridge infrastructure. For a wider view of activity across the infrastructure sector, see the Projects India infrastructure sector overview.
What this means for suppliers and contractors
The SRM Contractors award confirms that MORTH continues to push bridge construction contracts through Uttarakhand, a mountainous state where bridge infrastructure is critical to road connectivity. With 17 of 30 tracked bridge projects nationally at the construction-started stage, demand for inputs — including ready-mix concrete, structural steel, falsework systems, and construction equipment — remains elevated.
The five projects currently under approvals represent the next wave of procurement. Suppliers who engage early with project promoters at this stage are better placed to convert pipeline visibility into commercial outcomes. Projects India's full project tracker covers the live pipeline across all stages and geographies.
With no open India tenders in Infrastructure Projects recorded at the time of publication, contractors and vendors should monitor approval-stage projects closely for tender issuance. Recent high-value awards in adjacent segments — such as the Rs 805-crore Mumbai flyover linking CSMT and Lalbaug — further illustrate the scale of bridge and elevated-structure investment under way nationally.
Frequently asked questions
Who awarded the Rs 1.38 billion bridge contract in Uttarakhand?
The contract was awarded by the Ministry of Road Transport and Highways (MORTH) to SRM Contractors. The award was reported on 30 October 2026. No further details on project scope or specific location within Uttarakhand were available at the time of publication.
How many bridge projects are currently tracked in India?
Projects India currently tracks 30 live bridge projects across India, with three added in the last 90 days. Of these, 17 are at the construction-started stage, five are under approvals, and three are nearly complete.
Which states have the most active bridge projects in India?
Based on Projects India data, Madhya Pradesh leads with 6 tracked bridge projects, followed by Maharashtra with 5, Uttar Pradesh with 4, Bihar with 3, and Assam and Gujarat with 2 each.


