Odisha Invites Consultancy Bids for 225 MW Floating Solar and Battery Storage Project
Odisha has issued a consultancy tender for a 225 MW floating solar power project paired with a battery energy storage system (BESS), as reported by Saur Energy on 19 October 2026. No promoter, project cost, or reservoir location has been disclosed in available reporting. The tender covers consultancy services, indicating the project remains at an early procurement stage.
| Detail | Information |
|---|---|
| Project type | Floating Solar + Battery Energy Storage System (BESS) |
| Capacity | 225 MW |
| Tender type | Consultancy |
| State | Odisha |
| Promoter / Client | Not disclosed in available reporting |
| Project value | Not disclosed in available reporting |
| Stage | Tender issued (consultancy) |
Floating Solar in Context: India's Growing Water-Surface Pipeline
Floating solar installations have gained traction across India as a way to generate power while limiting land acquisition requirements. Projects India tracks a live pipeline of 1,313 solar-based power projects across India, reflecting the scale of activity in this sub-sector. Floating solar schemes are already in construction in other states: KPI Green Energy's project at Kadana Dam in Mahisagar, Gujarat, valued at Rs 489 crore, is currently under construction, as is Gujarat State Electricity Corporation Limited's floating solar project at the same dam. The Odisha tender adds a BESS component, which distinguishes it from many utility-scale floating solar schemes that do not include integrated storage.
Odisha's Solar Pipeline and Eastern India's Expanding Footprint
Odisha already hosts active solar development. Projects India's records include a solar power project at Boudh, Odisha, promoted by Envirocare Infrasolution Private Limited, valued at Rs 351 crore and currently under approvals — consistent with the broader national pattern in which regulatory clearances represent the most congested stage in the solar pipeline.
Nationally, Projects India tracks 642 solar-based power projects at the under-approvals stage, compared with 221 at construction started and 195 at planning. Only 129 are recorded as completed. This distribution signals that a large volume of committed capacity is still working through clearance processes, with Odisha's new floating solar consultancy tender likely to follow a similar trajectory before construction procurement opens.
Where Solar Project Activity Is Concentrated
The geographic spread of Projects India's solar pipeline shows activity weighted heavily towards southern and western states. Karnataka and Maharashtra each account for 188 tracked projects, followed by Telangana at 139, Andhra Pradesh at 93, Gujarat at 86, and Rajasthan at 83. Odisha falls outside the top six by volume, but the 225 MW floating solar proposal, if it advances to construction, would add meaningful capacity in a state where the solar pipeline is less saturated than in the leading markets.
For suppliers and equipment makers already active in Karnataka, Maharashtra, or Gujarat, the Odisha tender represents an early signal worth monitoring as eastern India's renewable pipeline matures. The power projects sector overview on Projects India covers the full breadth of activity across states and sub-sectors.
What this means for suppliers and contractors
Because the current tender is for consultancy services, direct construction and equipment procurement opportunities are not yet open. However, the issuance of a consultancy tender is typically the first formal procurement step before detailed project reports, equipment specifications, and eventually engineering, procurement, and construction contracts are floated. Suppliers of floating solar mounting structures, pontoon systems, mooring equipment, inverters, and BESS technology should register interest at this stage.
The inclusion of battery energy storage alongside floating solar also broadens the supplier opportunity set beyond conventional solar panel and mounting system vendors. BESS integrators, civil contractors with experience in water-based structures, and power evacuation specialists are among the categories likely to find relevant scope as the project develops.
Projects India tracks 24 new solar-based power projects added to its database in the last 90 days, illustrating the pace at which early-stage opportunities are emerging. Contractors seeking to position ahead of construction tenders can monitor project progression across the pipeline. Related recent activity includes canal-top solar projects widening India's renewable energy mix, another format that, like floating solar, leverages non-land surfaces for generation.
Frequently asked questions
What is the Odisha 225 MW floating solar project?
Odisha has issued a consultancy tender for a 225 MW floating solar project integrated with a battery energy storage system. Reported on 19 October 2026, the tender covers consultancy services. The promoter, project cost, and specific reservoir location have not been disclosed in available reporting.
What stage is the Odisha floating solar BESS project at?
As of reporting on 19 October 2026, Odisha's 225 MW floating solar and BESS project is at the consultancy tender stage. This is the earliest formal procurement step; construction and equipment tenders are not yet open.
How many floating solar projects are under development in India?
Projects India tracks 1,313 solar-based power projects across India in total, including floating solar schemes. Notable floating solar projects in construction include KPI Green Energy's Rs 489 crore project and GSECL's project, both at Kadana Dam in Gujarat.


