Kia India to Invest USD 2 Billion in Second Andhra Pradesh Plant
Kia India is reported to invest USD 2 billion in a second manufacturing facility in Andhra Pradesh, with the new plant set to produce both internal combustion engine and electric vehicles and add 200,000 units to the company's annual production capacity. The investment was reported by four outlets on 12 November 2026.
| Detail | Information |
|---|---|
| Promoter | Kia India |
| Project type | New manufacturing plant |
| Location | Andhra Pradesh |
| Investment value | USD 2 billion |
| Vehicle types | ICE and electric vehicles |
| Capacity addition | 200,000 vehicles per annum |
| Stage | Announced / Early |
ICE and Electric Vehicles Both in Scope
NDTV, reporting on 12 November 2026, specifically noted that the new facility is intended to cover both internal combustion engine cars and electric vehicles. The remaining three outlets — Construction Review, autoX and CarAndBike — confirmed the USD 2 billion investment figure and the Andhra Pradesh location, while Construction Review additionally reported the 200,000-vehicle annual capacity addition. No outlet provided further breakdown of the product mix or phasing.
Kia already operates a manufacturing presence in Andhra Pradesh. For context on the company's earlier expansion activity in the state, see Kia India Plans $1.5 Billion Expansion of Andhra Pradesh Plant, tracked previously on this platform.
Andhra Pradesh's Growing Role in Indian Auto Manufacturing
The reported project adds to an already active pipeline of automobile investment in Andhra Pradesh. Projects India tracks 161 live projects in the automobiles sub-sector, of which 18 are located in Andhra Pradesh, making it the third most active state in this sub-sector after Maharashtra (33 projects) and Tamil Nadu (26 projects).
Recent activity in the state includes Eicher Motors Limited's motorcycle manufacturing facility at Tirupati, Andhra Pradesh, valued at Rs 2,508 crore and currently at the Approvals Received stage. Andhra Pradesh's established automotive cluster, existing supplier networks and port connectivity continue to draw significant capital into the state.
Sector-Wide Pipeline: Stage and Geography
Across the 161 automobile projects tracked by Projects India, the stage distribution shows a substantial volume of work in early preparation. Fifty-one projects are Under Approvals, 33 are at the Planning stage and 32 have reached Construction Started — indicating a broad pipeline that suppliers and contractors can monitor across different readiness horizons.
Beyond Andhra Pradesh, Maharashtra leads with 33 tracked projects, followed by Tamil Nadu (26), Karnataka (15), Gujarat (13) and Telangana (9). This geographic spread signals sustained capital deployment across multiple industrial corridors. Four new automobile projects have been added to the tracked database in the last 90 days, reflecting continued momentum in the sector.
Notable projects currently in the pipeline include Maruti Suzuki India Limited's automobile facility at Sanand, Ahmedabad in Gujarat, valued at Rs 35,000 crore and under approvals, as well as Hyundai Motor India Limited's EV and multi-model global export hub at Talegaon, Pune, currently at the Planning stage. Hyundai Motor India's broader EV capex commitments further illustrate the scale of investment being directed toward electric mobility across the country.
What this means for suppliers and contractors
A USD 2 billion greenfield automobile plant of this scale represents a significant procurement opportunity across civil construction, structural steel, mechanical and electrical systems, paint shop equipment, conveyor and assembly line technology, and utilities infrastructure. Suppliers active in Andhra Pradesh's existing automotive cluster — which already supports Kia's first plant — are positioned to engage early.
The confirmation that the facility will cover both ICE and electric vehicles broadens the equipment and component scope beyond a pure-EV build, encompassing conventional powertrain assembly systems alongside battery and EV-specific infrastructure. Contractors with experience in large-scale greenfield auto plants, particularly those already operating in Andhra Pradesh or in adjacent states such as Telangana and Tamil Nadu, should monitor this project as it moves through approvals.
With 51 automobile projects currently at the Under Approvals stage nationally, the Kia announcement is one of several near-term opportunities likely to enter active procurement within the next one to two years. Suppliers are advised to track the full Industrial Projects pipeline for early visibility on tendering activity as projects advance.
Frequently asked questions
How much is Kia India investing in its second plant?
Kia India is reported to invest USD 2 billion in its second manufacturing facility in Andhra Pradesh. The figure was confirmed by four separate outlets reporting on 12 November 2026, covering Construction Review, autoX, CarAndBike and NDTV.
Where will Kia India's second plant be located?
Three of the four reporting outlets specifically named Andhra Pradesh as the location for Kia India's second manufacturing plant. No more precise site within Andhra Pradesh was confirmed in the available headlines.
Will Kia India's new plant make electric vehicles?
Yes. NDTV, reporting on 12 November 2026, stated that the new Andhra Pradesh plant is intended to produce both internal combustion engine cars and electric vehicles. The other three outlets did not specify the vehicle type breakdown.
How many vehicles will the new Kia India plant produce?
Construction Review reported on 12 November 2026 that the new plant will add 200,000 vehicles to Kia India's annual production capacity. This figure was not corroborated by the other three reporting outlets.


