Cabinet Clears Rs 14,500 Crore Scheme for 92 GWh Storage
India's Union Cabinet has approved a viability gap funding (VGF) scheme worth Rs 14,500 crore to support the development of 92 GWh of energy storage capacity in the country. The decision was reported by NDTV and nationpathindia.com on 4 November 2026, and by Energetica India Magazine on 5 November 2026. All three outlets corroborate both the scheme value of Rs 14,500 crore and the target capacity of 92 GWh.
The scheme falls under the broader Power Projects sector and is classified within hydel-based power, where pumped storage hydro represents a significant share of storage capacity under development across India.
Scheme at a Glance
| Detail | Value |
|---|---|
| Scheme value | Rs 14,500 crore |
| Target storage capacity | 92 GWh |
| Funding mechanism | Viability Gap Funding (VGF) |
| Approving authority | Union Cabinet |
| Reported date | 4–5 November 2026 |
Context: India's Pumped Storage and Hydel Pipeline
The Cabinet decision arrives against a backdrop of substantial activity in hydel-based power projects across India. Projects India tracks 2,131 projects in this sub-sector, with seven added in the last 90 days alone. Of the total tracked projects, 1,070 are currently at the Under Approvals stage — meaning the pipeline of potential work awaiting clearance is by far the largest cohort, nearly four times the number at Construction Started (264 projects).
Pumped storage is a prominent component of this pipeline. Among recently tracked projects, the Pumped Storage Hydro Power Project at Kalahandi, Odisha, promoted by Odisha Hydro Power Corporation Limited, is valued at Rs 3,160 crore and is currently under approvals. The Pumped Storage Hydel Power Project at Badarwa, Sonbhadra, Uttar Pradesh, promoted by Jhariya Ananturja Private Limited, is valued at Rs 7,457.68 crore and is also under approvals. Tata Power's Bhivpuri Off-Stream Open Loop Pumped Storage Project in Raigad, Maharashtra, worth Rs 2,470 crore, has already entered construction.
The geographical concentration of tracked hydel projects is notable. Himachal Pradesh leads with 438 tracked projects, followed by Arunachal Pradesh (416), Uttarakhand (260), Maharashtra (182), Jharkhand (98) and Madhya Pradesh (76). These states represent the primary geographies where hydel and storage-related project activity is concentrated.
Stage Breakdown: Where the Pipeline Stands
The stage distribution of Projects India's 2,131 tracked hydel projects reveals where in the development cycle activity is clustered:
- Under Approvals: 1,070 projects
- Construction Started: 264 projects
- Completed: 247 projects
- Planning: 208 projects
- Hold: 142 projects
- Approvals Received: 71 projects
The large number of projects at the Under Approvals and Planning stages indicates that a significant volume of hydel and storage capacity remains to be unlocked — a pipeline that VGF support of the kind now approved by Cabinet could help advance. The 142 projects on hold also represent latent capacity that policy incentives may help revive.
What this means for suppliers and contractors
For equipment makers, civil contractors and engineering firms active in energy storage and hydel power, the Cabinet's approval signals a fresh tranche of publicly backed demand. VGF schemes are designed to improve project financial viability, which typically accelerates developer decision-making and procurement timelines for projects that have been stalled at the approvals or planning stage.
With 1,070 hydel-related projects currently under approvals in Projects India's database — many of them pumped storage schemes — suppliers should monitor this cohort closely for movement into active tendering. The states with the densest pipelines (Himachal Pradesh, Arunachal Pradesh and Uttarakhand) remain the most likely near-term sources of procurement activity, though Maharashtra and Odisha are also seeing pumped storage projects move through approvals.
Projects India currently records zero open tenders in the Power Projects sector, but the Cabinet decision may prompt fresh tender issuance as developers seek to bring VGF-eligible projects to market. Suppliers can monitor live opportunities at the Projects India tenders page. Related activity in the broader energy storage space is also worth watching — see our earlier coverage of IESA's call for long-duration storage scale-up and Datta Power Infra's 400 MWh BESS MoU in Odisha for context on where private investment is moving alongside public support.
Frequently asked questions
How much has the Indian Cabinet approved for energy storage under the VGF scheme?
India's Union Cabinet has approved a viability gap funding scheme worth Rs 14,500 crore to support the development of 92 GWh of energy storage capacity. The decision was reported by multiple outlets on 4 and 5 November 2026.
How many hydel power projects are currently tracked in India?
Projects India tracks 2,131 projects in the hydel-based power sub-sector. Of these, 1,070 are under approvals, 264 are under construction, and 208 are at the planning stage, with Himachal Pradesh and Arunachal Pradesh hosting the largest concentrations.
Which states have the most hydel power projects in India?
Based on Projects India data, Himachal Pradesh leads with 438 tracked hydel projects, followed by Arunachal Pradesh with 416, Uttarakhand with 260, Maharashtra with 182, Jharkhand with 98, and Madhya Pradesh with 76.


