InsightsData report
Data report · Ferrous Metals (Iron & Steel) · Chhattisgarh

Upcoming Steel Plant Projects in Chhattisgarh

Projects India tracks 336 ferrous metals projects in Chhattisgarh, with 282 verified and a combined recorded cost of about Rs 2.42 lakh crore. Four new projects were added in the last 90 days.

NS
Nitisha ShindeResearch Desk, Projects India

9 min read · 1,663 words
Upcoming Steel Plant Projects in Chhattisgarh

Projects India tracks 336 ferrous metals (iron and steel) projects in Chhattisgarh, of which 282 are marked verified and 282 are upcoming — not completed or cancelled. Four new projects were added to our database in the last 90 days. Among those with a recorded cost, the combined investment reaches about Rs 2.42 lakh crore, making Chhattisgarh one of the most active steel-project markets in the country for EPC contractors and equipment suppliers.

Chhattisgarh steel projects at a glance

MetricFigure
Total projects tracked (all stages)336
Verified projects282
Combined recorded project cost~Rs 2.42 lakh crore
Added in last 90 days4
Added in the 90 days before that12
Projects under approvals203
Construction started51
Approvals received30
Completed79
On hold42

Largest upcoming steel plant projects in Chhattisgarh

The table below lists the highest-value upcoming projects in our records, drawn from the ferrous metals project pipeline in Chhattisgarh.

ProjectPromoterLocationCostStage
Integrated Steel Plant at Dhamni, MungeliKusum Smelters Private LimitedMungeliRs 19,331 croreUnder Approvals
Bhilai Steel Plant ExpansionSteel Authority of India LimitedDurgRs 17,265 croreUnder Approvals
Captive Power Plant at Nagarnar, BastarNMDC LimitedBastarRs 15,525 croreConstruction Started
Integrated Iron and Steel Plant Expansion at Dagori VillageNova Iron and Steel LimitedBilaspurRs 10,834 croreUnder Approvals
Steel Project Expansion at Kalmi & GorkaJindal Steel & Power LimitedRaigarhRs 10,613 croreHold
Iron Ore Beneficiation and Pellet Plant at SivpuriNR Iron and Power Private LimitedRaigarhRs 8,917 croreUnder Approvals
Integrated Steel Plant at Shivpuri, RaigarhNR Iron & Power Private LimitedRaigarhRs 8,917 croreUnder Approvals
Steel Plant at Shivpuri, RaigarhNR Iron & Power Private LimitedRaigarhRs 8,840 croreApprovals Received
Crude Steel Expansion at RajnandgaonKalyani Ispat LimitedRajnandgaonRs 6,753 croreApprovals Received
Captive Power Unit at Somani, RajnandgaonGodawari Power and Ispat LimitedRajnandgaonRs 5,920 crorePlanning
Steel Plant at Sarora, RaipurGodawari Power & Ispat LimitedRaipurRs 5,000 croreUnder Approvals
Arc Furnaces Plant at Tumidh, RaigarhMashiva Metals LLPRaigarhRs 4,500 croreUnder Approvals
Steel Plant at Bilha, BilaspurJayaswals Neco Industries LimitedBilaspurRs 3,800 croreHold
Integrated Steel Manufacturing Plant at Dagori VillageJayaswal Neco Industries LimitedBilaspurRs 3,800 croreHold

Three features stand out in this pipeline. First, the concentration of capital at the top is significant — the SAIL Bhilai expansion alone at Rs 17,265 crore and the Kusum Smelters greenfield at Rs 19,331 crore together account for a substantial share of the recorded investment. Second, NR Iron and Power Private Limited appears across multiple entries in Raigarh at similar cost values, suggesting a phased or restructured project that suppliers should track carefully as distinct procurement events. Third, NMDC's Nagarnar project is the most advanced large project, already in the Construction Started stage, meaning civil, mechanical and electrical packages are actively or imminently in play.

Where the projects are concentrated

Geography matters for logistics, labour and local procurement. As the chart below shows, Raipur and Raigarh together account for the majority of steel projects in Chhattisgarh.

Upcoming projects by city — Ferrous Metals (Iron & Steel) in Chhattisgarh
Upcoming projects by city — Ferrous Metals (Iron & Steel) in Chhattisgarh — Raipur: 132; Raigarh: 68; Bilaspur: 21; Rajnandgaon: 16; Raigarh (CHHAT): 16; Durg: 14; Bemetara: 12; Bastar: 11; Balodabazar-Bhatapara: 10; Mahasamund: 6Raipur132Raigarh68Bilaspur21Rajnandgaon16Raigarh (CHHAT)16Durg14Bemetara12Bastar11Balodabazar-Bhatapara10Mahasamund6
Source: Projects India database, October 2026

Raipur leads with 132 projects tracked, followed by Raigarh with 68 and a separate Raigarh (CHHAT) designation with 16. Bilaspur records 21 projects, Rajnandgaon 16, Durg 14, and Bemetara 12. For suppliers evaluating where to place a regional office or stock a consignment depot, Raipur and Raigarh present the highest density of active procurement activity. Bastar, though lower in project count at 11, carries the high-value NMDC Nagarnar project that is already under construction. Mungeli — home to the Rs 19,331 crore Kusum Smelters greenfield — is a location to watch as approvals progress, since it is not yet in the top-count cities but carries outsized capital value. Contractors already positioned in Raipur can use that base to reach Rajnandgaon, Bemetara and Balodabazar-Bhatapara (10 projects), all of which are within the central Chhattisgarh corridor.

What stage the projects are at — and what that means for procurement

Stage distribution is the clearest signal of where commercial opportunities sit right now. As the chart below shows, the pipeline is heavily weighted toward the approvals phase.

Projects by stage — Ferrous Metals (Iron & Steel) in Chhattisgarh
Projects by stage — Ferrous Metals (Iron & Steel) in Chhattisgarh — Under Approvals: 203; Completed: 79; Construction Started: 51; Hold: 42; Approvals Received: 30; Cancelled: 16; Planning: 7; Nearly Completion: 3Under Approvals203Completed79Construction Started51Hold42Approvals Received30Cancelled16Planning7Nearly Completion3
Source: Projects India database, October 2026

With 203 projects under approvals and 30 with approvals received, a large portion of the pipeline is still moving through regulatory and environmental clearances. These projects are not yet issuing tenders, but they represent early-stage engagement opportunities for consultants, environmental specialists, detailed engineering firms and pre-feasibility study providers. The 51 projects with construction started are the most immediately actionable for EPC contractors, structural steel fabricators, DRI kiln suppliers, electric arc furnace vendors, material handling system providers and civil contractors. The 42 projects on hold require monitoring — some will reactivate, and suppliers with an existing relationship are best placed when procurement resumes. The 7 projects in planning are earliest-stage and suit consultants and technology licensors rather than EPC or equipment firms. Refer to the guide on steel plant EPC contractors in India for a fuller breakdown of which services each project stage typically demands.

Most active promoters in Chhattisgarh steel

Knowing which promoters are running multiple projects helps sales teams prioritise account relationships. The chart below ranks the most active by number of projects in our database.

Most active promoters — Ferrous Metals (Iron & Steel) in Chhattisgarh (projects)
Most active promoters — Ferrous Metals (Iron & Steel) in Chhattisgarh (projects) — Godawari Power and Ispat Limited: 6; Shri Bajrang Power and Ispat Limited: 5; VSRA Steels Private Limited: 5; Gos Ispat private Limited: 5; Kusum Smelters Private Limited: 4; Maa Kali Alloys Udyog Private Limited: 4; Chhattisgarh Steel & Power Limited: 4; Animesh Ispat Private Limited: 4; Rama Power and Steel Private Limited: 4; Shree Shyam Sponge and Power Limited: 4Godawari Power and Ispat Limited6Shri Bajrang Power and Ispat Limi…5VSRA Steels Private Limited5Gos Ispat private Limited5Kusum Smelters Private Limited4Maa Kali Alloys Udyog Private Lim…4Chhattisgarh Steel & Power Limited4Animesh Ispat Private Limited4Rama Power and Steel Private Limi…4Shree Shyam Sponge and Power Limi…4
Source: Projects India database, October 2026

Godawari Power and Ispat Limited leads with 6 projects and a combined recorded cost of about Rs 13,775 crore across locations including Raipur and Rajnandgaon. Shri Bajrang Power and Ispat Limited has 5 projects worth about Rs 1,798 crore, and VSRA Steels Private Limited also has 5 projects worth about Rs 1,479 crore. Kusum Smelters Private Limited, though it has 4 projects, carries the highest combined recorded cost among multi-project promoters at about Rs 21,022 crore — driven largely by the Rs 19,331 crore Mungeli greenfield. For equipment and material suppliers, a relationship with Godawari Power and Ispat or Kusum Smelters covers multiple procurement cycles across different projects and stages. For a national view of the ferrous metals pipeline, our database tracks projects across all states.

Projects added to the database in the last 90 days

Four steel projects were added to Projects India's Chhattisgarh ferrous metals records in the 90 days to October 2026, indicating continued new activity even as the overall pace has moderated from the 12 additions in the prior period.

What this means for suppliers and contractors

The Chhattisgarh steel pipeline offers different entry points depending on what a company sells or builds.

Suppliers targeting multiple projects in a single geography — particularly Raipur or Raigarh — can improve margin by consolidating logistics and service teams. The national steel project pipeline provides context for how Chhattisgarh's activity compares with other states. For live tender notices issued by these projects and related government bodies, the Projects India tenders section is updated continuously.

How to track these projects

The 336 projects described here are part of the broader industrial project database for Chhattisgarh maintained by Projects India, which tracks 84,608 projects nationally across sectors. Each ferrous metals project record includes promoter details, stage history, location, recorded cost where available, and — for verified projects — contact information for the project office, EPC contractor or equipment buyer that is not available through news searches alone. Sales teams and EPC contractors can use stage filters to focus on construction-started or approvals-received projects, set alerts for projects moving out of the approvals stage, and export lists for CRM use. A free sample project report is available to evaluate the depth of data before subscribing.

Frequently asked questions

How many steel plant projects are there in Chhattisgarh?

Projects India tracks 336 ferrous metals (iron and steel) projects in Chhattisgarh across all stages, of which 282 are verified. The combined recorded cost of projects with a known value is about Rs 2.42 lakh crore. Raipur and Raigarh have the highest concentration of projects.

What is the Raigarh Ispat And Power Private Limited steel plant project?

Raigarh Ispat And Power Private Limited is developing a Steel Plant at Shivpuri, Raigarh, Chhattisgarh, with a recorded cost of Rs 897 crore. The project is at the Approvals Received stage and was added to the Projects India database in the last 90 days. A directory profile is available on the Projects India platform.

Which is the largest upcoming steel plant project in Chhattisgarh?

By recorded cost, the Integrated Steel Plant at Dhamni, Mungeli, being developed by Kusum Smelters Private Limited at Rs 19,331 crore, is the largest single upcoming project tracked by Projects India in Chhattisgarh. It is currently under approvals.

What steel projects in Chhattisgarh are already under construction?

Projects India records 51 ferrous metals projects in Chhattisgarh with construction started. The highest-value project at this stage is NMDC Limited's captive power plant at Nagarnar, Bastar, at Rs 15,525 crore. A re-rolling mill expansion by Shri Bajrang Power Private Limited in Raipur is also at this stage.

Which companies are most active in Chhattisgarh steel projects?

Godawari Power and Ispat Limited leads with 6 projects and about Rs 13,775 crore in combined recorded cost. Kusum Smelters Private Limited has 4 projects but the highest combined cost at about Rs 21,022 crore. Shri Bajrang Power and Ispat Limited and VSRA Steels Private Limited each have 5 projects in our records.

Which cities in Chhattisgarh have the most steel plant projects?

Raipur leads with 132 ferrous metals projects, followed by Raigarh with 68, Bilaspur with 21, Rajnandgaon with 16, and Durg with 14, according to Projects India's database. Bastar, despite fewer projects, carries the high-value NMDC Nagarnar project already under construction.

Get the full list of 433 Ferrous Metals (Iron & Steel) projects in Chhattisgarh

  • Project name, promoter, cost, stage and location
  • Verified decision-maker contacts
  • Updated daily — plus live tenders
Or ask on WhatsApp Browse Ferrous Metals (Iron & Steel) projects in Chhattisgarh →
NS
About the authorNitisha Shinde · Research Desk, Projects India

Nitisha Shinde leads the research desk at Projects India, which tracks upcoming private and government projects, tenders and awarded contracts across 51 sectors in India.

This article was drafted with AI assistance from Projects India's own project and tender records, then reviewed and approved by our research desk before publication.

More from Insights

Steel Plant Tenders in India: Govt & Private Contracts
Steel Plant Tenders in India: Govt & Private Contracts
Upcoming Steel Plant Projects in West Bengal: Key Leads
Upcoming Steel Plant Projects in West Bengal: Key Leads
Upcoming Steel Plant Projects in India: Key Leads
Upcoming Steel Plant Projects in India: Key Leads