Steel Manufacturing Companies & Plants in India: Directory
Projects India tracks 1,766 upcoming ferrous metals and steel projects across India, backed by a combined recorded cost of around Rs 29.98 lakh crore. This directory covers integrated, mini, stainless and green steel plants by promoter, location and project stage.
8 min read · 1,587 words
Projects India tracks 1,766 upcoming ferrous metals and steel projects across India as of October 2026, of which 1,264 are verified. The promoters behind them range from large integrated steel producers and public-sector undertakings to mid-size sponge-iron and rolling-mill operators spread across Chhattisgarh, Odisha, West Bengal, Karnataka, Maharashtra and beyond. Combined recorded project cost stands at approximately Rs 29.98 lakh crore.
Most Active Steel Manufacturing Companies in India
The table below lists the promoters with the highest number of steel projects in our database, along with their combined recorded capital outlay. These are the organisations that EPC contractors, equipment suppliers and consultants should prioritise for early engagement.
| Promoter | Projects tracked | Combined recorded cost |
|---|---|---|
| JSW Steel Limited | 24 | ~Rs 2.36 lakh crore |
| Steel Authority of India Limited (SAIL) | 22 | ~Rs 1.44 lakh crore |
| ArcelorMittal Nippon Steel India Limited | 6 | ~Rs 3.36 lakh crore |
| Kalyani Steels Limited | 6 | ~Rs 64,773 crore |
| Jindal Stainless Limited | 6 | ~Rs 64,444 crore |
| Rungta Mines Limited | 18 | ~Rs 44,132 crore |
| Shyam Steel Industries Limited | 7 | ~Rs 28,256 crore |
| RBSSN Ferrous Industries Private Limited | 7 | ~Rs 7,601 crore |
| BMW Industries Limited | 7 | ~Rs 4,841 crore |
| Kapila Metals Private Limited | 8 | ~Rs 6,234 crore |
| Maithan Steel And Power Limited | 8 | ~Rs 1,263 crore |
| SRI Subramanya Sponge Iron Private Limited | 7 | ~Rs 910 crore |
SAIL is a central public-sector undertaking under the Ministry of Steel. All other promoters in this list are private-sector companies. As the chart below shows, the spread of active promoters underlines that steel capex in India is not concentrated in one or two hands — mid-size and regional players account for a significant share of project volume.
Largest Steel Plant Projects in India: Key Leads
For suppliers and EPC contractors in the steel sector, the projects below represent the highest-value procurement opportunities currently in our database. Note that several are expansion projects at existing sites, which often move faster through approval stages than entirely new greenfield developments.
| Project | Promoter | Location | Recorded cost | Stage |
|---|---|---|---|---|
| Integrated Steel Plant, Mahakalpara, Kendrapada | ArcelorMittal Nippon Steel India Limited | Kendrapara, Odisha | Rs 1,34,004 crore | Under Approvals |
| Steel Plant, Kerjang, Angul | Jindal Steel & Power Limited | Angul, Odisha | Rs 1,19,952 crore | Construction Started (Dec 2026) |
| Integrated Steel Plant, Mahakalpara, Kendrapara | ArcelorMittal Nippon Steel India Limited | Kendrapara, Odisha | Rs 1,02,275 crore | Under Approvals |
| Steel Plant, Jatadhar, Jagatsingpur — Expansion | JSW Utkal Steel Limited | Jagatsinghapur, Odisha | Rs 75,000 crore | Hold |
| Crude Steel Project, Paradip, Jagatsingpur | JSW Utkal Steel Limited | Jagatsinghapur, Odisha | Rs 67,100 crore | Under Approvals |
| Integrated Steel Plant, Paradip | JSW Steel Limited | Paradip, Odisha | Rs 65,000 crore | Approvals Received |
| Integrated Steel Mfg Unit, Kalinga Nagar, Jajpur — Expansion | Neelachal Ispat Nigam Limited | Jajapur, Odisha | Rs 61,769 crore | Under Approvals |
| Steel Project, Kalinganagar, Jajpur | Tata Steel Orissa Limited | Jajpur, Odisha | Rs 61,000 crore | Nearly Completion |
| Green Steel Plant, Salav, Raigad | JSW Steel Limited | Raigad, Maharashtra | Rs 60,000 crore | Hold |
| Steel Plant, Hazira, Surat — Expansion | ArcelorMittal Nippon Steel India Limited | Surat, Gujarat | Rs 60,000 crore | Construction Started (Dec 2026) |
| Steel Plant, Thelkoloi Village, Sambalpur — Expansion | Bhushan Power & Steel Limited | Sambalpur, Odisha | Rs 55,000 crore | Under Approvals |
| Stainless Steel Mfg Plant, Maharashtra — Phase I | Jindal Stainless Limited | Maharashtra | Rs 40,000 crore | Under Approvals |
Two projects — Jindal Steel & Power's Angul plant and ArcelorMittal Nippon Steel's Hazira expansion — are already in the Construction Started stage with a December 2026 expected completion. The Tata Steel Kalinganagar project is at Nearly Completion. These three are the most time-sensitive for any supplier still seeking to enter their supply chains. For a broader view of upcoming steel plant projects across India, our Insights section carries regularly updated coverage.
Where Steel Plant Demand Is Concentrated: States and Project Stages
Odisha, Chhattisgarh and West Bengal are the dominant states by sheer volume of steel projects, but Karnataka, Maharashtra, Jharkhand, Andhra Pradesh and Punjab all carry meaningful pipelines. The chart below maps upcoming projects by state and makes the geographic concentration clear.
Odisha alone accounts for several of the ten largest projects by recorded cost, with major integrated plants at Kendrapara, Angul, Paradip, Jajpur and Jagatsingpur. Chhattisgarh — the state with the highest project count at 337 — is driven primarily by secondary and mini-steel operations including sponge iron, billets and rolling mills. West Bengal's 186 projects include a recently added cold-rolled coil expansion by Manaksia Steels at Haldia and a briquette and metal recovery project by Jai Balaji Industries. Andhra Pradesh's pipeline includes a TMT and structural steel rolling mill expansion at Tadipatri by Sugna Sponge & Power.
In terms of project stage, as the chart below shows, the largest single group sits at Under Approvals (918 projects), followed by Completed (452) and Construction Started (340). Projects at the Approvals Received or Construction Started stage are where near-term procurement activity is most concentrated.
Our records show 37 new steel projects were added to the database in the 90 days leading up to October 2026, against 56 in the preceding 90-day window. Recent additions span Jharkhand, West Bengal, Chhattisgarh, Andhra Pradesh and Bihar, signalling continued distributed investment across secondary and mini-steel segments. The full ferrous metals and iron and steel project database is updated continuously.
How to Approach Steel Manufacturing Companies in India
The right moment to engage a project team depends entirely on where the project sits in its lifecycle. Below is a practical guide for EPC contractors, equipment suppliers, consultants and B2B sales teams.
Under Approvals and Planning
At these stages, the project owner is typically working through environmental clearances, land acquisition and detailed feasibility. The procurement team has usually not been constituted, and vendor lists are not finalised. This is the right time for consultants, technology licensors and DPR-preparation specialists to make contact. For suppliers of major equipment — blast furnace components, continuous casting machines, rolling mill stands — early registration of capabilities with the owner's technical team can influence vendor shortlists before tenders are floated.
Approvals Received and Construction Started
Once approvals are in hand, project owners typically appoint a project management consultant (PMC) or principal EPC contractor relatively quickly. Civil and structural contractors, mechanical erection agencies and electrical contractors should seek to be on the approved vendor list before the main construction contracts are awarded. For smaller sub-packages — refractory lining, instrumentation, fire-fighting systems, cooling towers — orders are often placed after the main contract is signed.
Nearly Completion
Projects approaching commissioning still require consumables, commissioning spares, operation and maintenance contracts and manpower services. The Tata Steel Kalinganagar project is at this stage. Operations and maintenance contractors should initiate conversations with the project owner now.
Hold
Projects on hold — including JSW Steel's green steel plant at Raigad and the JSW Utkal expansion at Jagatsingpur — should be monitored rather than approached for active procurement. They can move quickly once constraints are resolved. Platforms such as Projects India's intelligence database track status changes so sales teams are alerted when a hold project restarts.
Across all stages, the decision-maker for major equipment is usually the head of projects or the chief procurement officer at the promoter company, while the EPC contractor's procurement team controls orders for execution-phase packages. Knowing which layer to approach — owner or contractor — saves time and improves conversion. Checking live government and private tenders alongside project-stage data ensures you do not miss packages that have already been floated.
What This Means for Suppliers and EPC Contractors
The scale and distribution of steel plant projects in India points to several specific opportunities for the B2B market.
- Integrated plant specialists: The largest projects — ArcelorMittal Nippon Steel at Kendrapara, Jindal Steel & Power at Angul, JSW at Paradip — require full-scope EPC capability across ironmaking, steelmaking and rolling. Only a small number of contractors can handle this end-to-end, making early positioning critical.
- Stainless and specialty steel: Jindal Stainless Limited carries six projects in our database with a combined recorded cost of around Rs 64,444 crore, including a Phase I manufacturing plant in Maharashtra at Rs 40,000 crore. Suppliers of cold-rolling equipment, annealing and pickling lines, and specialty alloys should prioritise this company's project pipeline.
- Green steel: JSW Steel's Rs 60,000 crore green steel plant at Salav, Raigad — currently on hold — signals the direction of future investment. Suppliers of direct reduced iron (DRI) technology, hydrogen infrastructure and electric arc furnace (EAF) systems should track this segment closely. Our upcoming steel plant projects overview covers the green steel pipeline in more detail.
- Secondary and mini-steel: Chhattisgarh and West Bengal concentrate large numbers of sponge iron, billet and rolling mill projects. These are typically smaller in individual contract value but faster-moving and more accessible for regional contractors and material suppliers. Recent additions — Aloke Steels in Ramgarh, Maa Mangla Ispat in Raigarh, Mongia Power in Giridih — illustrate the pace of new entrants.
- State-wise targeting: EPC contractors and suppliers operating from regional offices can use state-level data to prioritise field sales. Odisha and Chhattisgarh warrant dedicated coverage; Karnataka and Maharashtra also carry substantial pipelines.
- Tender tracking: Many packages within large steel projects are broken into smaller tenders for civil works, mechanical supply, electrical and instrumentation. Steel plant tenders — both government and private — are published on an ongoing basis and can be monitored through our platform.
For teams that want to assess their fit against specific projects before committing to a subscription, a free sample project report is available. The full database of 84,619 projects tracked nationally — of which 1,766 are in ferrous metals and steel — is accessible through the Projects India intelligence platform.
Frequently asked questions
How many steel plant companies and projects are tracked in India?
Projects India tracks 1,766 upcoming ferrous metals and iron and steel projects across India as of October 2026, of which 1,264 are verified. The combined recorded project cost is approximately Rs 29.98 lakh crore. Promoters range from large integrated producers to secondary and mini-steel operators.
Which states have the most steel plants and steel projects in India?
Chhattisgarh leads with 337 projects, followed by Odisha (187), West Bengal (186), Karnataka (183), Maharashtra (177) and Jharkhand (128). Odisha dominates by recorded project cost, hosting several of the largest integrated and crude steel plants currently under development.
Which are the largest steel manufacturing companies by project investment in India?
By combined recorded project cost in our database, JSW Steel Limited leads at approximately Rs 2.36 lakh crore across 24 projects, followed by ArcelorMittal Nippon Steel India Limited at Rs 3.36 lakh crore across six projects and Steel Authority of India Limited at Rs 1.44 lakh crore across 22 projects.
Is there a list of stainless steel manufacturing companies in India with plants?
Jindal Stainless Limited is the most prominent stainless steel manufacturer tracked in our database, with six projects and a combined recorded cost of around Rs 64,444 crore. This includes a Phase I stainless steel manufacturing plant in Maharashtra valued at Rs 40,000 crore, currently under approvals.
Which green steel plant projects are coming up in India?
JSW Steel Limited's Rs 60,000 crore green steel plant at Salav, Raigad, Maharashtra is the largest green steel project currently in our database. It is on hold. Suppliers of EAF technology, DRI systems and hydrogen infrastructure should monitor its status for when it reactivates.
What is the best way to find steel plant tenders and procurement contacts in India?
Matching project stage to the right contact layer is the key step. Projects India tracks project stage, promoter identity and procurement milestones for 1,766 steel projects. Live tender notices for steel plant packages — civil, mechanical, electrical and instrumentation — are also available through the platform's tender-intelligence module.
Get the full list of 2,310 Ferrous Metals (Iron & Steel) projects in India
- Project name, promoter, cost, stage and location
- Verified decision-maker contacts
- Updated daily — plus live tenders